My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-276 D
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-276 D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 10:29:43 AM
Creation date
10/1/2015 12:34:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/09/2008
Control Number
2008-276 D
Agenda Item Number
8.DD.
Entity Name
Interstate Engineering Corp.
Subject
South RO Water Treatment Plant Improvements Material and Equipment
Area
South RO Water Treatment Plant
Project Number
UCP 2859
Bid Number
2008027
Supplemental fields
SmeadsoftID
7558
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Motors larger than 100 horsepower: Each motor shall be furnished with certified test results. <br /> Each motor shall be subjected to a complete test consisting of full load heat run, percent slip, <br /> running light current, locked rotor current, breakdown torque (calculated), starting torque, <br /> winding resistance, high potential, efficiencies at 100 , 75 and 50 percent of full load, power <br /> factors at 100 , 75 and 50 percent of full load, and bearing inspection . The Engineer reserves the <br /> right to witness these tests . <br /> F . Test Reports : Copies of all test results shall be submitted to the Engineer for review . The number <br /> of copies of the tests shall be the same as the number of Shop Drawings to be submitted as <br /> specified in the Contract Documents . Single copies of witnessed raw test data shall be submitted <br /> to the Engineer immediately upon completion of such tests . No motor shall be shipped prior to <br /> the Engineer's approval of factory tests . <br /> 1 .06 TOOLS AND SPARE PARTS <br /> A. Furnish spare arts for each motor or <br /> p p group of motors in the same ratio as specified for the driven <br /> equipment. As a minimum, furnish the following for motors 50 h.p . and above : <br /> 1 . One ( 1 ) spare set of upper and lower ball bearings, including retainers and seals, for each <br /> motor size installed . <br /> i2 . One ( 1 ) spare motor shaft key or equivalent for each motor size installed . <br /> 3 . One ( 1 ) spare terminal box gasket for each motor. <br /> i 4 . One ( 1 ) spare fill and drain plug and grease nipple for each motor size installed. <br /> 5 . One ( 1 ) complete set of any additional Manufacturer's recommended spare parts. <br /> B . Spare parts shall be plainly tagged and marked for identification and re-ordering. <br /> C. Furnish all special tools necessary to disassemble, service, repair and adjust the equipment. <br /> 1 .07 WARRANTY <br /> 1 A. All equipment furnished under this Section shall be guaranteed by the Manufacturer against <br /> defects of workmanship and materials for a period of one ( 1 ) year from date of acceptance. All <br /> such equipment or defective parts, shall be replaced by the Manufacturer at no cost to the Owner. <br /> i <br /> B . Motors supplied for Variable Frequency Drive (VFD) applications shall be guaranteed as stated <br /> above, and further warranted for use under VFD operation by the motor manufacturer. <br /> PART 2 - PRODUCTS <br /> l2.01 GENERAL REQUIREMENTS <br /> A. Electric motors driving identical machines shall be identical. <br /> i <br /> 044572017 <br /> 16490 - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.