. ? VA <br /> f <br /> NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> 4 <br /> CONTINUING CONSULTING SERVICES ORIU <br /> � <br /> FOR WATER AND WASTEWATER TREATMENT PLANTS U , ') o <br /> WORK ORDER No . 1 <br /> Project Description and Understanding <br /> There are three existing lift stations that pump into lift station (LS) # 109 , causing it to have excessive <br /> runtimes . Minor modifications to the existing piping and the three lift stations along Indian River Blvd <br /> near 10"' Street will improve the hydraulics of the wastewater collection system related to LS # 109 . The <br /> force main from the three lift stations that pumps into LS # 109 is parallel to the force main leaving LS <br /> # 109 . In order to improve the operation of LS # 109 , the project will consist of construction of force main <br /> piping that will re-direct the flow from the three lift stations away from LS # 109 and replace the pumps in <br /> the three lift stations in order to compensate for the increase pressure on these lift stations . There are no <br /> proposed modifications to LS # 109 as part of this project. <br /> The Utility Staff will use this design to engage a contractor to perform this construction . Bidding or the <br /> execution of a contract to perform this work is not included in this project. <br /> ENGINEERING SCOPE OF SERVICES <br /> Task 1 — Design <br /> KHA will provide the following Scope of Services ; including production of drawings , technical <br /> specifications , permitting, certification, construction observations , and record drawing. <br /> The design of this project will include taps and force main piping necessary to route the flow away from <br /> LS 109 ; selection of new pumps for LS 108 , LS 114 , and LS 115 ; and electrical design and modifications <br /> to the existing lift station panels . The hydraulic design of the modifications to the three lift stations will <br /> be based on the Owner providing a static pressure of the receiving force main at the tie-in location. No <br /> hydraulic analysis down stream of the tie-in will be included in this design, including impacts to the other <br /> existing lift stations in this system. It is assumed that this modification to this system has been accounted <br /> for by the Owner in their Master Plan of this wastewater collection system. This design will include <br /> upgrading to power supply to 230 VAC , three phase power from 230 VAC single phase power at LS 115 , <br /> with a new power service from Fort Pierce Utilities ; if feasible . This will likely cause the panel to be <br /> replaced , as part of this design . These design modifications will re-route a significant amount wastewater <br /> flow away from LS 109 and increase the pressure capacities at LS 108 , LS , 114 , and LS 115 . <br /> The <br /> original design flow of these three lift stations will not be re-evaluated or changed as part of this design . <br /> The force main piping design will be based on a survey and utility locates . The survey will be provided <br /> by KHA and is included in this scope . The horizontal and vertical locations of the existing forcemains <br /> and other Utilities ,for this survey and design will be provided Indian River County Utilities Department <br /> along with Sunshine-One-Call . The site for this forcemain construction is at the northwest corner of <br /> Indian River Boulevard and approximately 200-ft of the right-of-way west on 10`h Street, and on record <br /> drawing provided by the Owner of the existing force mains in this vicinity . The survey will be used as a <br /> base drawing for the design and the record drawings for this construction . <br /> KRA will prepare technical specifications with sketches and drawings that integrate Owner' s <br /> standardized equipment components into the design of this project. <br /> Consultant will provide 3 copies of technical specifications , 3 sets of full size (2406) and 3 sets of half <br /> size ( 11x17) drawings for the Owner' s use . All plans and technical specifications will be provided to the <br /> Owner in electronic format (AutoCAD 2000 / MS Word, respectively) . The technical specifications will <br /> be based on the Owners current Utility Standards . <br /> H:AGeneralABarlow\Pmposals\IRCAKiinley-Hum 001 - LS Modifications Scope and Board Agenda.doc <br />