My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-204
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-204
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2016 1:54:22 PM
Creation date
9/30/2015 7:56:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/24/2004
Control Number
2004-204
Agenda Item Number
11.J.2
Entity Name
Kimley-Horn Associates
Subject
Waste and wastewater treatments plants-force main piping LS#109
Work Order No.1
Archived Roll/Disk#
3223
Supplemental fields
SmeadsoftID
4251
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The scope described above is anticipated to take approximately twelve weeks from notice to proceed , <br /> depending on duration of bidding or procurement (not included) , pernlitting, and actual construction . <br /> INFORMATION PROVIDED BY OWNER : <br /> The Owner shall provide the record drawings of both of the force mains on 10"' Avenue in the vicinity of <br /> Indian River Boulevard and hydraulic pressure of the 10-inch (receiving) force main at this location from <br /> historical data and projections of the system. <br /> WORK NOT INCLUDED IN THIS SCOPE OF SERVICES : <br /> The bidding or procurement of a contractor or the materials and labor necessary for this construction is <br /> not included in this scope of engineering services . Application of the Utility right-of-way construction <br /> permits and building permits are not included in this scope of services . <br /> FEES : <br /> Consultant will provide these Services as described herein on a lump sum basis for the following fee : <br /> Task Fee <br /> Design $ 119600 <br /> Permitting, Certification, and Record Drawings $ 29600 <br /> Construction Phase Services 430 <br /> Engineering Total $ 189300 <br /> The fees and services stated in this Agreement are valid until December 31 , 2004 . <br /> Consultant will provide these Services in accordance with our non-exclusive professional engineering <br /> agreement approved by the Board of County Commissioners on April 6t", 2004 between Indian River <br /> County and Kimley-Horn and Associates , Inc . <br /> IN WITNESS WHEREOF the parties have executed these presents this 24th day of August , 2004 . <br /> BOARD OF COUNTY COMMISSIONERS <br /> /1 /y INDIAN RIVER COUNTY , FLORIDA <br /> BY : BY : <br /> Caroline D . Ginn, Ch an <br /> Board of Counfy C 46nissioners <br /> � <br /> �i!� "C � (1� ► 5r U� ce f ✓CSi '4"4 <br /> Title : Approved by. xhCU s ,-:20.04 <br /> (If not PRESIDENT, attach evidence of authority to sign. ) <br /> 9 :: Y • �1l�.. Y <br /> ' WITNESS : a24; ATTEST <br /> WJ <br /> WITNESS : Jeffrey K . i'tgri, erk` Court <br /> s <br /> � • eana • a • , tt, .. <br /> By : a . <br /> Deputy Clerk Of Court <br /> APPROVEMe By <br /> A . acrd, County Ad ' strator <br /> APPROVED AS TO FORkBA 40 <br /> ANrt ir � n , e � � � ci � t � �l ( m ollins , Cou Attome <br /> H:\General\Barlow\Proposals\IRC\Kin ley-Horn 001 - LS Modifications Scope and Board Agenda.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.