My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-034
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 2:12:31 PM
Creation date
9/30/2015 7:40:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/18/2005
Control Number
2005-034
Agenda Item Number
11.J.2
Entity Name
Kimley-Horn and Associates
Subject
Work Order No.4 Wabasso Subaqueous Crossing
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
3865
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
placement of the proposed pipeline . Although no historic resources in the area are <br /> anticipated, SHPO coordination is required during the ERP process . <br /> The project will involve the movement/handling of sediments and the dewatering of <br /> construction areas . The disposal of the sediment and the discharge of water will require <br /> the characterization of these materials . Kimley-Horn will review the specifics of the <br /> landing and launching sites in terms of access , space, and suitability. <br /> Kimley-Horn will prepare and provide design profile and details and specifications for <br /> the 12-inch watermain, 12-inch forcemain and 244nch reuse main to be installed in <br /> separate sections for each pipe by the HDD method. This design will include (6) six <br /> separate HDD installations and the necessary underground piping that will connect each <br /> end of pipe, including the tie-in details . <br /> Kimley-Horn will provide construction phase services for this project including bidding, <br /> contract administration, and shop drawing review, coordination and meeting attendance, <br /> construction observations, turbidity monitoring, preparation of record drawings and final <br /> certification of construction completion of the project . These construction phase services <br /> cover the installation of the 12-inch forcemain, the 12-inch watermain and the 24-inch <br /> reuse main. The 244nch reuse main will be constructed last under the same contract . <br /> SCOPE OF WORK <br /> Task 1. 0 — Meetings, QA/QC, and Project Permit Coordination <br /> Kimley-Horn will attend meetings, provide project coordination and QA/QC of all <br /> deliverables , including : <br /> 1 . Attend kick-off meeting with Indian River County Utilities (IRCU) staff to discuss <br /> details and collect pertinent information for the project . <br /> 2 . Attend monthly progress meetings to discuss status of submittals, request/collect <br /> additional information, discuss and/or resolve project issues and progress of <br /> construction. <br /> 3 . Attend one pre- application meeting each with the FDEP, FDOT and U. S . Army <br /> Corps of Engineers . <br /> 4 . Provide project updates and respond to two requests for additional information from <br /> each agency regarding permit application. <br /> Task 2. 0 — Collection of Existing Data <br /> 1 . Collect existing geotechnical data and design drawings of the existing bridges and <br /> any readily available information regarding existing bathymetric data. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.