placement of the proposed pipeline . Although no historic resources in the area are <br /> anticipated, SHPO coordination is required during the ERP process . <br /> The project will involve the movement/handling of sediments and the dewatering of <br /> construction areas . The disposal of the sediment and the discharge of water will require <br /> the characterization of these materials . Kimley-Horn will review the specifics of the <br /> landing and launching sites in terms of access , space, and suitability. <br /> Kimley-Horn will prepare and provide design profile and details and specifications for <br /> the 12-inch watermain, 12-inch forcemain and 244nch reuse main to be installed in <br /> separate sections for each pipe by the HDD method. This design will include (6) six <br /> separate HDD installations and the necessary underground piping that will connect each <br /> end of pipe, including the tie-in details . <br /> Kimley-Horn will provide construction phase services for this project including bidding, <br /> contract administration, and shop drawing review, coordination and meeting attendance, <br /> construction observations, turbidity monitoring, preparation of record drawings and final <br /> certification of construction completion of the project . These construction phase services <br /> cover the installation of the 12-inch forcemain, the 12-inch watermain and the 24-inch <br /> reuse main. The 244nch reuse main will be constructed last under the same contract . <br /> SCOPE OF WORK <br /> Task 1. 0 — Meetings, QA/QC, and Project Permit Coordination <br /> Kimley-Horn will attend meetings, provide project coordination and QA/QC of all <br /> deliverables , including : <br /> 1 . Attend kick-off meeting with Indian River County Utilities (IRCU) staff to discuss <br /> details and collect pertinent information for the project . <br /> 2 . Attend monthly progress meetings to discuss status of submittals, request/collect <br /> additional information, discuss and/or resolve project issues and progress of <br /> construction. <br /> 3 . Attend one pre- application meeting each with the FDEP, FDOT and U. S . Army <br /> Corps of Engineers . <br /> 4 . Provide project updates and respond to two requests for additional information from <br /> each agency regarding permit application. <br /> Task 2. 0 — Collection of Existing Data <br /> 1 . Collect existing geotechnical data and design drawings of the existing bridges and <br /> any readily available information regarding existing bathymetric data. <br /> 3 <br />