My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-034
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 2:12:31 PM
Creation date
9/30/2015 7:40:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/18/2005
Control Number
2005-034
Agenda Item Number
11.J.2
Entity Name
Kimley-Horn and Associates
Subject
Work Order No.4 Wabasso Subaqueous Crossing
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
3865
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . Collect existing and readily available utility record drawings, survey information, <br /> (including title searches) easements and legal descriptions, and rights-of--way <br /> descriptions . Compile the bathymetric data collected as part of this task . <br /> 3 . Kimley-Horn will research readily available information regarding existing <br /> submerged fauna and flora within the project vicinity of the project alignment. <br /> 4 . Collect any bridge and/or pipe condition reports that may be used to expedite the ERP <br /> process . <br /> Task 3. 0 — Field Survey, Geotechnical Exploration, and Environmental Data <br /> Collection <br /> 1 . KHA environmental staff will conduct a limited field reconnaissance in order to <br /> characterize the existing conditions of the two landing sites . This field reconnaissance <br /> will be performed in order to complete and submit an environmental assessment in <br /> accordance with the requirements of the ERP process . This assessment may include , but <br /> is not limited to the following : <br /> o Existing land uses within the construction area <br /> o Upland vegetation characterization <br /> o Wetland delineation (if applicable) <br /> o Submerged aquatic vegetation (if applicable) <br /> o State and Federally listed species and their habitat observations <br /> 2 . Survey the planned drilling and landing sites for horizontal and vertical locations <br /> of existing features , including the implementation of available record drawing data and <br /> include channel elevations at center of bridges . . <br /> 3 . Provide up to four landside subsurface investigations . The investigations will be <br /> incorporated into the specifications in order for Bidders to account for the subsurface <br /> conditions that may be encountered during construction. <br /> Task 4. 0 - Design <br /> 1 . Kimley-Horn will prepare and provide design drawings of the proposed profile using <br /> the bathymetry data. Consultant will prepare preliminary outline of project with <br /> several alternatives to the project for discussion with IRC . <br /> 2 . Kimley-Horn will prepare design details of the proposed tie-in details to the existing <br /> watermain, forcemain, and proposed reuse main. <br /> 3 . Kimley-Horn will prepare technical specifications for the proposed piping and <br /> construction . <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.