My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-034
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 2:12:31 PM
Creation date
9/30/2015 7:40:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/18/2005
Control Number
2005-034
Agenda Item Number
11.J.2
Entity Name
Kimley-Horn and Associates
Subject
Work Order No.4 Wabasso Subaqueous Crossing
Archived Roll/Disk#
4000
Supplemental fields
SmeadsoftID
3865
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 7. 0 — Construction Permitting <br /> A construction permit will be required from FDEP for constructing the watermain, <br /> forcemain, and reuse main. Forms 62 -555 . 900( 1 ), 62 -604 . 300(7)(a) . Construction <br /> drawings will be submitted as part of the permit application. The construction drawings <br /> must reflect line size, location, construction technique, standard separation distances from <br /> sanitary and storm sewers, monitoring equipment, sample taps, color code, tie-in details, <br /> and disinfection prior to placing the line into service . Kimley-Horn will prepare tie-in <br /> details for the reuse, watermain, and forcemain and depict these on the drawings . <br /> Prior to placing the lines into service, the lines must be flushed in order to remove debris <br /> that may have been trapped within the line during construction . It is assumed that each of <br /> the new lines will be pigged in order to minimize flushing water volume . <br /> Once the project is constructed and passes the pressure and bacteriological testing, final <br /> certification and clearance will be requested from DEP . Record drawings will be <br /> prepared based on information provided by the contractor and will accompany the request <br /> for release and final clearance, which will be provided during the construction phase <br /> services task. <br /> Kimley-Horn will perform the following under this task : <br /> 1 . Identify methods for disposal for the waters generated by pigging and disinfecting the <br /> pipelines and prepare a narrative on disposal of waters generated by pigging and <br /> disinfecting the pipelines . <br /> 2 . Prepare and submit the construction permit applications including drawings and <br /> specifications . <br /> 3 . Address up to two requests for information (RFI) from DEP for each application <br /> made . <br /> Task 8. 0 — Construction Phase Services <br /> Kimley-Horn will provide construction phase services for this project, including bidding <br /> and contract administration, shop drawing review, coordination and meeting attendance, <br /> construction observation, field monitoring including turbidity monitoring, preparation of <br /> record drawings , and final certification of completion of the project . It is anticipated that <br /> the duration of construction phase (notice to proceed to final completion) will be <br /> approximately ten ( 10) months and assumes that both the East and west crossings will be <br /> drilled at the same time, i . e. , the contractor will have two boring rigs . It is assumed that <br /> part-time on-site construction observations will be provided during the drilling, reaming, <br /> and pull-back phases , which is assumed to be approximately 1 week for each of the two <br /> pipe sections . Field observations will also be conducted during the piping tie-ins to the <br /> existing water and force-main pipes, during flushing, and pressure testing of the installed <br /> piping system, including up to three days per week during significant construction <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.