My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-235
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2016 1:38:31 PM
Creation date
9/30/2015 10:59:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/24/2007
Control Number
2007-235
Agenda Item Number
7.T.
Entity Name
SPS Contracting, Inc.
Subject
Agreement construct sewage force main
Area
CR 510 west pf SR A1 A
Supplemental fields
SmeadsoftID
6408
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7i u J7 <br /> r1 <br /> T-- <br /> SECTION <br /> —SECTION 00530 - EJCDC <br /> STANDARD FORM OF AGREEMENT <br /> BETWEEN OWNER AND CONTRACTOR <br /> ON THE BASIS OF A STIPULATED /PRICE <br /> THIS AGREEMENT ("Agreement' or "Contract"), dated the day of L in the <br /> year 20�-by and between Indian River County, a political subdivision qf the State of Florida <br /> (hereinafter called OWNER) and SPS Contracting , Inc. . (hereinafter called CONTRACTOR) . <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br /> agree as follows: <br /> ARTICLE 1 WORK <br /> CONTRACTOR as an independent contractor and not as an employee shall furnish and complete <br /> all of the necessary labor, material, and equipment to perform the work as specified or indicated in <br /> the Contract Documents . The work is generally described as follows: <br /> A. CONTRACTOR shall complete all work as specified or indicated in the Contract <br /> Documents. The work is generally described as follows which shall include, but is <br /> not necessarily limited to the following . <br /> Construction of approximately 5,000 linear feet of 12" diameter sewage <br /> force main and associated appurtenances along CR 510 West of SR A-1 -A. <br /> Construction consists of, but is not limited to, utilities exploration , <br /> coordination with any permitting agencies, trenching, dewatering, <br /> installation of pipe with fittings and all appurtenances, 14" directional <br /> bores, valves, wet taps, restrainers, flush existing force main, soil <br /> compaction, testing, irrigation repair, private property replacement or <br /> repair, franchise utility repair and traffic control . PVC pipe shall be C-900 <br /> per Indian River County Utility Standards and Specifications. <br /> ARTICLE 2 ENGINEER <br /> The project has been designed by Masteller & Moler, Inc. , hereinafter called ENGINEER , and who <br /> is to act as OWNER'S representative , assume all duties and responsibilities and have the rights <br /> and authority assigned to ENGINEER in the Contract Documents in connection with completion of <br /> the work in accordance with the Contract Documents. <br /> ARTICLE 3 CONTRACT TIME <br /> 3 . 1 The CONTRACTOR shall be substantially completed with the following timeframe <br /> (a) Within 15 calendar days from effective date of Notice to Proceed , Contractor <br /> 00530- 1 <br /> H\Proiects\0649\Bidding Contract Specifications\Spec Template\2007\00530\Agreement between Owner Contractor Rev. <br /> 012507.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.