Laserfiche WebLink
3-03 15 <br /> Z of c1 <br /> ao i�'-D3y <br /> PERMIT AND INTERLOCAL AGREEMENT <br /> (No. IRC-2) <br /> THIS PERMIT and INTERLOCAL AGREEMENT, dated this 3rd day of <br /> March ,2015 by and between INDIAN RIVER FARMS WATER CONTROL <br /> DISTRICT, a drainage district organized and existing under the General Drainage Laws <br /> of the State of Florida, whose address is 7305 4th Street, Vero Beach, Florida, hereinafter <br /> referred to as the "District", and the INDIAN RIVER COUNTY, a political subdivision <br /> of the State of Florida, hereinafter referred to as the "Permittee". <br /> NOW, THEREFORE, the District does hereby grant unto the Permittee a permit <br /> for a period of sixty (60) months from January 1, 2015, unless sooner terminated as <br /> hereinafter provided, to construct, maintain, inspect, operate and repair a 6" PVC force <br /> main located 5 feet inside the North right-of-way of the South Relief Canal from U.S. <br /> Highway No. 1 easterly to the vicinity of the lift station at the locations and in accordance <br /> with the plans and specifications attached hereto and marked "Exhibit A" and signed by <br /> the parties and, by reference, made a part hereof, together with the right of ingress and <br /> egress on and over the property at said locations; provided, however, that as a condition <br /> precedent to the rights herein granted, Permittee agrees to and with the District as <br /> follows: <br /> 1. That the construction and installation of force main has been in exact conformity <br /> with the plans prepared by Masteller & Moler Associates, Inc., marked "Exhibit <br /> A". <br /> 2. The rights shall extend only for force main used exclusively by Indian River <br /> County (unless otherwise agreed to by District) and belonging to the Permittee <br /> and the Permittee shall not have any right to assign or sublet this Permit or any <br /> part thereof unto a third party. <br /> 3. Permittee assumes full responsibility for the construction, operation and <br /> maintenance of said force main and shall save and hold harmless District from any <br /> expense, loss, damage or claim in regard thereto, and the District assumes and <br /> shall have no liability in connection therewith. The parties having expressly <br /> negotiated to allocate all risk and expense in connection therewith to Permittee. <br /> 1 <br />