My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 8:52:52 AM
Creation date
9/30/2015 8:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018
Agenda Item Number
7.M.
Entity Name
Lucas Marine Construction, Inc.
Subject
contract for Oslo Road bridge replacement
Area
Oslo road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4451
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
View images
View plain text
responsibility for the maintenance of barricades , signs , lights , and for providing <br /> watchmen shall continue until OWNER accepts the Project . <br /> 1 . 3 TREE AND PLANT PROTECTION <br /> A . Protect existing trees , shrubs and plants on or adjacent to the site that are shown <br /> or designated to remain in place against unnecessary cutting , breaking or skinning <br /> of trunk , branches , bark or roots . <br /> B . Do not store or park materials or equipment within the drip line . <br /> C . Install temporary fences or barricades to protect trees and plants in areas subject <br /> to traffic . <br /> D . Fires shall not be permitted under or adjacent to trees and plants . <br /> E . Within the limits of the Work , water trees and plants that are to remain , in order to <br /> maintain their health during construction operations . <br /> F . Cover all exposed roots with burlap and keep it continuously wet . Cover all <br /> exposed roots with earth as soon as possible . Protect root systems from <br /> mechanical damage and damage by erosion , flooding , run - off or noxious materials <br /> in solution . <br /> G . If branches or trunks are damaged , prune branches immediately and protect the <br /> cut or damaged areas with emulsified asphalt compounded specifically for <br /> horticultural use . <br /> H . Remove all damaged trees and plants that die or suffer permanent injury and <br /> replace them with a specimen of equal or better quality . <br /> I . Coordinate Work in this Section with requirements of other sections herein . <br /> 1 . 4 PROTECTION OF IRRIGATION <br /> The CONTRACTOR shall be responsible for maintaining in good condition all <br /> irrigation systems within the easements , which could be damaged by construction <br /> activities . The CONTRACTOR shall repair any irrigation systems damaged by <br /> construction activities within two (2 ) days . Irrigation systems partially within the right- <br /> of-way of Kings Highway and all intersecting side streets within project limits may be <br /> cut off and capped or connected to same system to maintain functionality . The <br /> CONTRACTOR shall be responsible for maintaining the functionality of the remaining <br /> portion of the system if it should fall outside of the right- of-way . <br /> 1 . 5 PROTECTION OF EXISTING STRUCTURES <br /> A . Underground Structures : <br /> 1 . Underground structures are defined to include , but not be limited to , all sewer , <br /> water , gas , and other piping , and manholes , chambers , electrical conduits , <br /> tunnels and other existing subsurface work located within or adjacent to the <br /> limits of the Work . <br /> 2 . All underground structures known to ENGINEER except service connections <br /> for water , sewer , electric , and telephone are shown . This information is <br /> GENERAL REQUIREMENTS <br /> GR - 12 <br /> F :\Public Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 1 - General Requirements . doc <br /> z 5/23/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).