My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 8:52:52 AM
Creation date
9/30/2015 8:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018
Agenda Item Number
7.M.
Entity Name
Lucas Marine Construction, Inc.
Subject
contract for Oslo Road bridge replacement
Area
Oslo road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4451
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
shown for the assistance of CONTRACTOR in accordance with the best <br /> information available , but is not guaranteed to be correct or complete . The <br /> existing utilities shown on the Contract Drawings are located according to the <br /> information available to the ENGINEER at the time the Drawings were <br /> prepared and have not been independently verified by the OWNER or the <br /> ENGINEER . Guarantee is not made that all existing underground utilities are <br /> shown or that the locations of those shown are accurate . The locations <br /> shown are for bidding purposes only . Finding the actual location of any <br /> existing utilities is the CONTRACTOR ' s responsibility and shall be done <br /> before it commences any work in the vicinity . Furthermore , the <br /> CONTRACTOR shall be fully responsible for any and all damages , which <br /> might be occasioned by the CONTRACTOR 's failure to exactly locate and <br /> preserve any and all underground utilities . The OWNER or ENGINEER will <br /> assume no liability for any damages sustained or costs incurred because of <br /> the CONTRACTOR 's operations in the vicinity of existing utilities or <br /> structures , nor for temporary bracing and shoring of same . If it is necessary <br /> to shore , brace , or swing a utility , contact the utility company or department <br /> affected and obtain their permission regarding the method to use for such <br /> work . <br /> 3 . Contact the various utility companies which may have buried or aerial utilities <br /> within or near the construction area before commencing work . Provide 48 <br /> hours minimum notice to all utility companies prior to beginning construction . <br /> 4 . Schedule and execute all work involving existing utilities in order to minimize <br /> necessary interruption of services . Whenever such interruption is necessary <br /> for completion of the work , notify the ENGINEER and the appropriate utility at <br /> least 48 hours in advance . Perform all work to repair/ restore utility service to <br /> the satisfaction of the appropriate utility . Include all costs related to service <br /> maintenance , interruption , and restoration in the appropriate line item in the <br /> Contract . <br /> 5 . Where it is necessary to temporarily interrupt house or business services , the <br /> CONTRACTOR shall notify the owner or occupant , both before the <br /> .• interruption (24 - hour minimum ) , and again immediately before service is <br /> resumed . Before disconnecting and pipes or cables , the CONTRACTOR <br /> shall obtain permission from their owner , or shall make suitable arrangement <br /> for their disconnection by their owner . 6 . Explore ahead of trenching and <br /> excavation work and uncover all obstructing underground structures suffi - <br /> ciently to determine their location , to prevent damage to them and to prevent <br /> interruption of the services which such structures provide . If CONTRACTOR <br /> damages an underground structure , restore it to original condition at <br /> CONTRACTOR ' s expense . <br /> 7 . Necessary changes in the location of the Work may be made by ENGINEER , <br /> to avoid unanticipated underground structures . <br /> 8 . If permanent relocation of an underground structure or other subsurface <br /> facility is required and is not otherwise provided for in the Contract <br /> Documents , ENGINEER will direct CONTRACTOR in writing to perform the <br /> GENERAL REQUIREMENTS <br /> GR - 13 <br /> F :\Public Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 1 - General Requirements . doc <br /> 5/23/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.