shown for the assistance of CONTRACTOR in accordance with the best <br /> information available , but is not guaranteed to be correct or complete . The <br /> existing utilities shown on the Contract Drawings are located according to the <br /> information available to the ENGINEER at the time the Drawings were <br /> prepared and have not been independently verified by the OWNER or the <br /> ENGINEER . Guarantee is not made that all existing underground utilities are <br /> shown or that the locations of those shown are accurate . The locations <br /> shown are for bidding purposes only . Finding the actual location of any <br /> existing utilities is the CONTRACTOR ' s responsibility and shall be done <br /> before it commences any work in the vicinity . Furthermore , the <br /> CONTRACTOR shall be fully responsible for any and all damages , which <br /> might be occasioned by the CONTRACTOR 's failure to exactly locate and <br /> preserve any and all underground utilities . The OWNER or ENGINEER will <br /> assume no liability for any damages sustained or costs incurred because of <br /> the CONTRACTOR 's operations in the vicinity of existing utilities or <br /> structures , nor for temporary bracing and shoring of same . If it is necessary <br /> to shore , brace , or swing a utility , contact the utility company or department <br /> affected and obtain their permission regarding the method to use for such <br /> work . <br /> 3 . Contact the various utility companies which may have buried or aerial utilities <br /> within or near the construction area before commencing work . Provide 48 <br /> hours minimum notice to all utility companies prior to beginning construction . <br /> 4 . Schedule and execute all work involving existing utilities in order to minimize <br /> necessary interruption of services . Whenever such interruption is necessary <br /> for completion of the work , notify the ENGINEER and the appropriate utility at <br /> least 48 hours in advance . Perform all work to repair/ restore utility service to <br /> the satisfaction of the appropriate utility . Include all costs related to service <br /> maintenance , interruption , and restoration in the appropriate line item in the <br /> Contract . <br /> 5 . Where it is necessary to temporarily interrupt house or business services , the <br /> CONTRACTOR shall notify the owner or occupant , both before the <br /> .• interruption (24 - hour minimum ) , and again immediately before service is <br /> resumed . Before disconnecting and pipes or cables , the CONTRACTOR <br /> shall obtain permission from their owner , or shall make suitable arrangement <br /> for their disconnection by their owner . 6 . Explore ahead of trenching and <br /> excavation work and uncover all obstructing underground structures suffi - <br /> ciently to determine their location , to prevent damage to them and to prevent <br /> interruption of the services which such structures provide . If CONTRACTOR <br /> damages an underground structure , restore it to original condition at <br /> CONTRACTOR ' s expense . <br /> 7 . Necessary changes in the location of the Work may be made by ENGINEER , <br /> to avoid unanticipated underground structures . <br /> 8 . If permanent relocation of an underground structure or other subsurface <br /> facility is required and is not otherwise provided for in the Contract <br /> Documents , ENGINEER will direct CONTRACTOR in writing to perform the <br /> GENERAL REQUIREMENTS <br /> GR - 13 <br /> F :\Public Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 1 - General Requirements . doc <br /> 5/23/01 <br />