My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 8:52:52 AM
Creation date
9/30/2015 8:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018
Agenda Item Number
7.M.
Entity Name
Lucas Marine Construction, Inc.
Subject
contract for Oslo Road bridge replacement
Area
Oslo road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4451
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . Major changes in scope . <br /> 2 . Activities modified since the previous submission . <br /> 3 . Revised projections of progress and completion . <br /> 4 . Other identifiable changes . <br /> C . Provide a narrative report as needed to define : <br /> 1 . Problem areas , anticipated delays , and the impact on the schedule . <br /> 2 . Corrective action recommended and its effect . <br /> 3 . The effect of changes on schedules of other prime contractors . <br /> 1 . 3 SUBMISSION OF THE CONSTRUCTION SCHEDULES <br /> On or before the tenth day after the effective date of the Agreement , submit the <br /> initial schedules to the ENGINEER . The ENGINEER will review the schedules and <br /> return a review copy to the CONTRACTOR within 21 days after receipt . If required <br /> by the ENGINEER , resubmit revised schedules on or before the seventh day after <br /> receipt of the review copy . If required by the ENGINEER , submit revised monthly <br /> progress schedules with that month 's application for payment . <br /> 1 . 4 DISTRIBUTION OF THE CONSTRUCTION SCHEDULES <br /> A . After receiving approval by the ENGINEER , distribute copies of the <br /> approved initial schedule and all reviewed revisions ( updated ) to : <br /> 1 . Job site file . <br /> 2 . Subcontractors , <br /> 3 . Other concerned parties . <br /> 4 . OWNER ( two copies ) . <br /> 5 . ENGINEER <br /> B . In the cover letter , instruct recipients to report promptly to the <br /> CONTRACTOR , in writing , any problems anticipated by the projections <br /> shown in the schedules . <br /> SECTION 00120 EXCAVATION AND EMBANKMENT <br /> Earthwork , including earthwork for drives outside the right- of-way limits , shall be paid for <br /> as embankment . Cost shall include all work specified in this section and Section <br /> 120 of the Standard Specifications . Such price and payment shall specifically <br /> include all cost of any roadway , lateral ditch or canal , and final dressing operations <br /> in accordance with Section 120 - 13 . 3 , <br /> B . Earthwork quantities shall be considered as in - place material with no shrinkage or <br /> expansion factors . <br /> C . Subsoil Excavation - Any excavation below the proposed bottom elevation of the <br /> select fill , isolated swale bottom locations , isolated locations for pipe installations <br /> and as approved by the engineer shall be paid for as subsoil excavation . <br /> TECHNICAL PROVISIONS <br /> TP -6 <br /> .� F :\Public Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 2 - Technical Provisions . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.