My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 8:52:52 AM
Creation date
9/30/2015 8:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018
Agenda Item Number
7.M.
Entity Name
Lucas Marine Construction, Inc.
Subject
contract for Oslo Road bridge replacement
Area
Oslo road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4451
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Approximately 2 . 0 ft of subsoil excavation is required in sublateral canals . Cost of <br /> replacement embankment shall be included in cost of subsoil excavation . <br /> Contractor to coordinate with county representative prior to any subsoil excavation . <br /> D . Embankment - General Requirements for Embankment Materials : The following is <br /> added after the first paragraph of Subarticle 120 - 7 . 2 : <br /> Roadway Design Standard Index No . 505 , Embankment Utilization Details is <br /> modified by the addition of the following : <br /> Any stratum or stockpile or soil which contains obvious pockets of highly organic <br /> material may be designated as muck or unsuitable for construction of subgrade by <br /> the Owner . <br /> Backfill material containing more than 2 . 0% by weight of organic material , as <br /> determined by FM 1 -T 267 and by averaging the test results for three randomly <br /> selected samples from each stratum or stockpile of a particular material , shall not <br /> be used in construction of the reinforced volume . If an individual test value of the <br /> three samples exceeds 3 . 0 % , the stratum or stockpile will not be suitable for <br /> construction of the reinforced volume . <br /> No A- 8 material permitted in embankment . <br /> F . Payment shall be made under : <br /> Item No . 120 -3 — Lateral Ditch Excavation — Per Cubic Yard <br /> Item No . 120-4 - Subsoil Excavation - Per Cubic Yard <br /> " Item No . 120 - 6 - 1 - Embankment - Per Cubic Yard <br /> SECTION 00160 STABILIZING <br /> A . Sub Article 160 -5 . 1 ( Page 146 ) is modified by the addition of the following : <br /> " The stabilization thickness indicated on plans shall be considered a minimum <br /> thickness . Thickness will vary to conform to the lines , and grades shown in the <br /> plans . " Minimum L . B . R . = 40 - No under-tolerance . <br /> B . Payment shall be made under : <br /> Item No . 160 -4 - Type B Stabilization ( 12 " ) - Per Square Yard <br /> SECTION 00285 OPTIONAL BASE COURSE <br /> A . Sub Article 285 -4 is modified by the addition of the following : <br /> Base material , thickness and requirements are described in the construction plans . <br /> Only one type of alternate base material shall be used No additional payment will <br /> be made for base thickness in excess of the specified thickness <br /> B . Payment shall be made under : <br /> Item No . 285 - 701 - Base Group 1 - Per Square Yard <br /> Item No . 285 - 706 - Base Group 6 - Per Square Yard <br /> TECHNICAL PROVISIONS <br /> TP - 7 <br /> FAPublic Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 2 - Technical Provisions . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.