Laserfiche WebLink
Approximately 2 . 0 ft of subsoil excavation is required in sublateral canals . Cost of <br /> replacement embankment shall be included in cost of subsoil excavation . <br /> Contractor to coordinate with county representative prior to any subsoil excavation . <br /> D . Embankment - General Requirements for Embankment Materials : The following is <br /> added after the first paragraph of Subarticle 120 - 7 . 2 : <br /> Roadway Design Standard Index No . 505 , Embankment Utilization Details is <br /> modified by the addition of the following : <br /> Any stratum or stockpile or soil which contains obvious pockets of highly organic <br /> material may be designated as muck or unsuitable for construction of subgrade by <br /> the Owner . <br /> Backfill material containing more than 2 . 0% by weight of organic material , as <br /> determined by FM 1 -T 267 and by averaging the test results for three randomly <br /> selected samples from each stratum or stockpile of a particular material , shall not <br /> be used in construction of the reinforced volume . If an individual test value of the <br /> three samples exceeds 3 . 0 % , the stratum or stockpile will not be suitable for <br /> construction of the reinforced volume . <br /> No A- 8 material permitted in embankment . <br /> F . Payment shall be made under : <br /> Item No . 120 -3 — Lateral Ditch Excavation — Per Cubic Yard <br /> Item No . 120-4 - Subsoil Excavation - Per Cubic Yard <br /> " Item No . 120 - 6 - 1 - Embankment - Per Cubic Yard <br /> SECTION 00160 STABILIZING <br /> A . Sub Article 160 -5 . 1 ( Page 146 ) is modified by the addition of the following : <br /> " The stabilization thickness indicated on plans shall be considered a minimum <br /> thickness . Thickness will vary to conform to the lines , and grades shown in the <br /> plans . " Minimum L . B . R . = 40 - No under-tolerance . <br /> B . Payment shall be made under : <br /> Item No . 160 -4 - Type B Stabilization ( 12 " ) - Per Square Yard <br /> SECTION 00285 OPTIONAL BASE COURSE <br /> A . Sub Article 285 -4 is modified by the addition of the following : <br /> Base material , thickness and requirements are described in the construction plans . <br /> Only one type of alternate base material shall be used No additional payment will <br /> be made for base thickness in excess of the specified thickness <br /> B . Payment shall be made under : <br /> Item No . 285 - 701 - Base Group 1 - Per Square Yard <br /> Item No . 285 - 706 - Base Group 6 - Per Square Yard <br /> TECHNICAL PROVISIONS <br /> TP - 7 <br /> FAPublic Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 2 - Technical Provisions . doc <br />