My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 8:52:52 AM
Creation date
9/30/2015 8:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018
Agenda Item Number
7.M.
Entity Name
Lucas Marine Construction, Inc.
Subject
contract for Oslo Road bridge replacement
Area
Oslo road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4451
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d . Add make - up liquid once per hour to bring pipe back to test <br /> pressure over a 3 hour period . <br /> e . Immediately following the end of the 3 hour period , begin test of <br /> pipe section . Test period is 2 hours . Add make - up fluid at 1 hour <br /> and 2 hours to return test section to test pressure . Measure all <br /> fluid added . Make - up fluid may not exceed the following : <br /> Nominal Pipe Size Allowance for Expansion <br /> ( in ) ( Gallons per 100 ft . ) <br /> 12 2 . 3 <br /> 14 2 . 8 <br /> 16 3 . 3 <br /> 18 4 . 3 <br /> 20 5 . 5 <br /> 22 7 . 0 <br /> 24 8 . 9 <br /> f . All leaks shall be repaired regardless of the total leakage as <br /> indicated by the test , and all pipes , valves and fittings and other <br /> materials found defective under the test shall be removed and re <br /> placed at the Contractor' s expense . Tests shall be repeated until <br /> leakage has been reduced below the allowable amount . <br /> g . All visible leaks shall be repaired regardless of the total leakage <br /> as indicated by the test , and all pipes , valves and fittings and <br /> other materials found defective under the test shall be removed <br /> and replaced at the Contractor' s expense . Tests shall be <br /> repeated until leakage has been reduced below the allowable <br /> amount . <br /> h . Should , in the judgment of the Engineer , it not be practical to <br /> follow the foregoing procedures exactly for any reason , <br /> modifications in the procedure shall be made as approved by the <br /> Engineer . In any event , the Contractor shall be responsible for <br /> the ultimate tightness of the raw watermain within the preceding <br /> requirements . <br /> 3 . 03 DISINFECTION <br /> A . The Contractor shall furnish and install suitable temporary connections to the <br /> piping , all necessary pressure pumps , hose , pipe connections , meters , <br /> gauges and other similar equipment , and all labor required , all without <br /> additional compensation for the disinfection of all required piping systems . <br /> Disinfection shall be conducted on the following systems : <br /> TECHNICAL PROVISIONS <br /> TP -22 <br /> FAPublic Works\Capital Projects\Oslo Road Lateral ABID DOCUMENTS\DIVISION 2 - Technical Provisions . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.