My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263B
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:52:07 AM
Creation date
9/30/2015 11:02:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
08/20/2007
Control Number
2007-263B
Agenda Item Number
county administer signature
Entity Name
Donadio & Associates
Subject
Punch List Building 1 - 2nd Floor - West Half
Area
New County Administration Building
Supplemental fields
SmeadsoftID
6490
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Administration Complex <br /> Bldg. 1 - 2nd Floor - West - Punch List <br /> Tuesday - 07/17/07 & Thursday -07/19/07 <br /> July 26, 2007 <br /> Page 14 <br /> Lounge Area 512 (continued) <br /> 4. Top left of hollow metal frame imperfections in the paint, need to be sanded and repainted. <br /> 5 . Vinyl base needs to be cleaned of drywall mud, paint, etc . in numerous locations especially to the right of <br /> Door 511B . <br /> 6. East wall to the left of Door 512 vinyl tile cut too short, VCT not set flush to the wall . <br /> 7. Bottom right of Door 51113 vinyl base is not set level. <br /> 8. VCT needs to be caulked where it abuts the hollow metal frame for Door 511B and also, left side of hollow <br /> metal frame 511B VCT cut short from the frame, would take a lot of caulking. <br /> 9. Right side of cabinetry counter top face and back splash needs to be cleaned of paint, caulking, etc. That is <br /> also true of the counter top itself. <br /> 10. Back left inside corner of the knee space, VCT flooring cut too short. Also, drywall above the vinyl base in <br /> this same area needs to be repainted and where the side end panel abuts the drywall, needs to be caulked in <br /> place. <br /> 11 . Sink needs to be caulked into the counter top. <br /> 12. Cabinet side panels and underside of upper cabinets above the sink needs to be caulked to the drywall. <br /> 13 . Ceiling tile above the upper cabinets cracked, damaged. <br /> 14. Ceiling grid around the boxed out area to the right of the base cabinets needs to be cleaned of paint. <br /> 15 . Return air grille not setting flush in the grid. <br /> 16. Ceiling tile to the northwest of A/C diffusers marks on the tile. <br /> 17 . Ceiling tile not setting flush in the grid at the boxed out area and the back wall at the upper cabinetry. <br /> File Room 513 <br /> 1 . Bottom right of Door 513 VCT flooring cut too short at the vinyl base. Also, vinyl base not properly secured <br /> and drywall above this vinyl base needs to be patched and repaired. <br /> 2. Drywall to the left of the duplex outlet to the left of Door 513 needs to be patched and repaired. <br /> 3 . Left inside corner of the east wall VCT cut too short. <br /> 4. Northwest comer that is the back right corner VCT joint excessive, file appears to have slipped, needs to be <br /> replaced. <br /> 5. Ceiling tile and grid to the left of door 513 at the sprinkler head dirt and damaged. <br /> 6. Ceiling grid and ceiling tile at the east wall towards the left inside corner, tile damaged, grid finish scratched. <br /> 7. Ceiling grid along the south wall double grid ceiling, ceiling tile is stripped is not setting flush, large gap, <br /> unacceptable. <br /> 8 . Ceiling grid in front of Door 513 at the light fixture, bent and twisted. <br /> Production Room 514 <br /> 1 . 2x2 light fixture above Door 512 not working. <br /> 2 . Carpet tile in front of Door 512 joints area very visible, need to be corrected in front of the door and to the <br /> right of the door. <br /> 3 . East wall between Door 512A and access leading into Open Office 509 vinyl base joint is excessive. <br /> 4. Vinyl base to the left of Door-513 is full of paint. <br /> 5 . Furniture being stored in this area. <br /> 6. Carpet tile stain on the carpet at the excess leading into Open Office Area 509. <br /> 7 . Counter top along the north wall left side at the back splash below data 43D& 44D needs to be cleaned. <br /> 8. East wall above the north duplex outlet dent in the wall at the underside of the upper cabinets, needs to be <br /> patched and repaired. <br /> 9. South wall to the left inside corner drywall needs to be patched and repaired at the underside of the upper wall <br /> cabinet. <br /> 10. Joints and counter tops needs to be filled, caulked flush. <br /> D O N A D I O <br /> & Associates, Architects, P. A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.