My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263B
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:52:07 AM
Creation date
9/30/2015 11:02:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
08/20/2007
Control Number
2007-263B
Agenda Item Number
county administer signature
Entity Name
Donadio & Associates
Subject
Punch List Building 1 - 2nd Floor - West Half
Area
New County Administration Building
Supplemental fields
SmeadsoftID
6490
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Administration Complex <br /> Bldg. 1 - 2nd Floor - West - Punch List <br /> Tuesday - 07/17/07 & Thursday -07/19/07 <br /> July 26, 2007 <br /> Page 18 <br /> Office 608 (continued) <br /> 13 . Top left inside corner to the left of the exterior window corner needs to sanded, caulked and repainted, <br /> insufficient coats of paint in this area. <br /> 14. Ceiling tile to the south of the light fixture coming right off the left exterior window, fingerprints, marks on <br /> the tile. <br /> Office 609 <br /> 1 . Outside face vinyl base cut too short to the hollow metal frame. <br /> 2. Bottom left inside face hollow metal frame vinyl base cut too short, caulking installed very rough, irregular. <br /> 3 . Inside face of bottom of door paint in the grain of the finish. <br /> 4. Bottom right of hollow metal door frame at the right inside corner drywall is very rough and irregular, needs <br /> to be sanded and repainted. <br /> 5 . Furniture completely installed in this room <br /> 6. Window sill needs to be caulked on the right and left sides of the jambs. <br /> 7. Drywall jambs on the westernmost window on the left hand side needs to be cleaned of drywall dust and <br /> repainted as necessary. <br /> 8. South window, window sill needs to be cleaned of drywall mud, etc., especially on the right edge of the sill <br /> where the drywall has been chipped. <br /> 9. East wall drywall around duplex outlet to the left of data 13D & 14D drywall is irregular needs to be sanded <br /> and repainted. <br /> 10. North wall center of the wall drywall mud on the grid. <br /> It . Ceiling tile to the south of the return air grille small chip in the edge. <br /> 12. East wall ceiling grid along the drywall needs to be cleaned of paint. <br /> Office 610 <br /> 1 . Furniture being installed in this room at this time. <br /> 2. Right side inside face of hollow metal frame 610 needs to be sanded and repainted. <br /> 3. Drywall around data outlet 15D & 16D on the west wall needs to be repainted. <br /> 4. Window sill where it abuts the drywall jamb on the right and left sides needs to be sanded and repainted neat <br /> and clean . <br /> 5 . Left inside comer at the sill and the drywall jamb needs to be sanded and repainted. <br /> 6. Right inside corner at the exterior wall approximately 2-311. down from the window, irregularity in the <br /> drywall, needs to be sanded and repainted. Also, this inside comer where the accent color needs to be cut in <br /> neat and clean . <br /> 7 . Stain on the carpet below the right side of the exterior window. <br /> 8 . Exterior window drywall jambs paint needs to be cut in neat and clean, right caulking is visible. <br /> 9 . Left inside comer on the east wall at the boxed out area where the accent color and the field color meet, needs <br /> to be sanded, caulked and repainted. <br /> 10. Drywall below the wall mounted door stop in two locations, need to be patched and repaired. <br /> 11 . Ceiling grid at the left, that is the east boxed out area needs to be cleaned of paint. Also, the ceiling grid at the <br /> exterior wall needs to be cleaned of drywall mud, etc. <br /> 12. Left inside corner directly to the left of the exterior window approximately 12 inches up off the floor, inside <br /> corner needs to be sanded and repainted. Also, in this same area paint on the carpet in multiple locations. <br /> 13 . Carpet cut into the door frame very irregular, also debris on the floor has not been removed underneath the <br /> carpet. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.