My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263B
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:52:07 AM
Creation date
9/30/2015 11:02:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
08/20/2007
Control Number
2007-263B
Agenda Item Number
county administer signature
Entity Name
Donadio & Associates
Subject
Punch List Building 1 - 2nd Floor - West Half
Area
New County Administration Building
Supplemental fields
SmeadsoftID
6490
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Administration Complex <br /> Bldg. 1 - 2nd Floor - West - Punch List <br /> Tuesday - 07/ 17/07 & Thursday -07/19/07 <br /> July 26, 2007 <br /> Page 6 <br /> Women 's Restroom 2-110 (continued) <br /> 17 . Right inside corner of the ceramic tile at the west wall right inside corner full of drywall mud, caulking, tape, <br /> etc, unacceptable. <br /> 18 . Ceiling grid above door leading into Handi-cap stall is dirty. <br /> 19 . Ceiling grid at the top right corner of the wall to the left of Door 2- 110 is dirty. <br /> 20. Ceiling grid abutting the drywall soffit needs to be caulked in place the complete length of the drywall soffit. <br /> Men's Restroom 2-111 <br /> 1 . Door 2- 111 bottom edge of door is damaged. <br /> 2 . Door 2- 111 hollow metal frame needs to be cleaned of carpet glue. <br /> 3 . Carpet at the ceramic tile needs transition strip installed and also at Door 2- 110. <br /> 4. Inside face of Door2- 111 needs to be cleaned of grout and debris. <br /> 5 . Hollow metal frame needs to be repainted where it abuts the drywall finish right and left sides and head of the <br /> door. <br /> 6. Floor tile needs to be cleaned of dirt, debris and grout joints need to be cleaned. <br /> 7. Top right inside corner between the drywall finish and the ceramic tile wainscot, unacceptable. That is above <br /> the lavatories . <br /> 8. Back splash needs to be caulked where it abuts the ceramic tile in the drywall finish. <br /> 9. Ceramic tile cut too large where the drain line penetrates the ceramic file wall. <br /> 10. Grout joint at the black file below lavatories voids in the grout and that is also true of the right inside corner. <br /> 11 . No grout in the inside corner and finish between the file and the drywall finish is rough and irregular. <br /> 12. Ceramic tile to the right of urinal, holes in the ceramic tile. <br /> 13 . Cove base below the Handi-cap stall sink needs to be cleaned of debris . <br /> 14. Grout joint at the black accent tile above the base the east wall at the Hindi-cap toilet voids in the grout. <br /> 15 . Left inside comer opposite the Handi-cap water closet, voids in the joint needs to be caulked and repainted or <br /> refinished. <br /> 16. Ceiling grid at the drywall header drywall ceiling needs to be caulked in place and grid needs to be cleaned of <br /> drywall mud, paint, etc . <br /> 17. Ceiling grid above the paper towel holder dispenser is dirty and also ceiling tile at the sprinkler head location <br /> fingerprints on the tile . <br /> Data Room 2-112 <br /> 1 . Door 112 right side of door to hinge needs to be completely refinished. <br /> 2. Vinyl threshold is not setting flush, not cut properly. <br /> 3 . Plywood back board needs to be touched-up fire treated paint where the edges have been cut and has <br /> been damaged. <br /> 4. Hollow metal door frame needs to be touched-up with paint at the head. <br /> 5 . Drywall on the left side of hollow metal door frame needs to be sanded, caulked and repainted at the complete <br /> left side from vinyl base up to the top corner and also at the head. <br /> 6. Back inside corner needs to be properly caulked and repainted. Very rough and irregular. <br /> 7 . Walls need to be touched-up with paint where there are fingerprints, dirt marks. <br /> 8. Right side of plywood back board behind data rack drywall finish is very rough and irregular, unacceptable <br /> needs to be redone . <br /> 9. Penetration in the ceiling needs to be cut neat and clean and trimmed out with ceiling grid. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.