Laserfiche WebLink
Indian River County Administration Complex <br /> Bldg. 1 - 2 d Floor - West - Punch List <br /> Tuesday - 07/17/07 & Thursday -07/ 19/07 <br /> July 26, 2007 <br /> Page 8 <br /> Electrical Room 2- 117 <br /> 1 . Hollow metal frame needs to be caulked the vinyl VCT flooring. <br /> 2. Right side inside corner drywall needs to be sanded and repainted, very rough and irregular especially at the <br /> ceiling. <br /> 3 . Left of Door 2- 117 drywall opening cut too large at light switch. Needs to be patched and repaired this <br /> complete area. <br /> 4. Drywall above doorframe 2- 117 needs to be sanded and repainted, texture very irregular. <br /> 5 . All penetrations in acoustical ceiling tile need to be cut out neat and clean and trimmed in metal grid. <br /> 6. VCT flooring needs to be cleaned. <br /> 7. Drywall between electrical panel LCP2 and LCL2, hole in the drywall needs to be patched and repaired . That <br /> is also true at the ceiling level , screw head to the right of LCL2 at the ceiling level . <br /> 8. Right inside corner to the right of LCL2 needs to be sanded and repainted, finish is rough and irregular. <br /> 9. Ceiling grid above H2W panel, dirt and debris on the grid in this area. <br /> Data Room 2-118 <br /> 1 . Middle electronic hinge is not installed as of this time . <br /> 2. Hollow metal frame needs to be caulked where it abuts the VCT flooring. <br /> 3 . Plywood backboard needs to be touched-up with fire resistant paint where the finish has been damaged . <br /> 4. Penetrations in the acoustical tile ceiling need to be cut neat and cleaned and trimmed in metal grid. <br /> 5 . Ceiling tile at the two duplex outlets, tile is damaged where it was cut around the outlets, needs to be replaced. <br /> 6. Grid around the A/C diffuser is damaged, needs to be replaced. <br /> 7 . East wall of data room, large opening in the wall needs to be patched and repaired. <br /> 8 . Drywall above the right side of hollow metal doorframe needs to be sanded, caulked and repainted. <br /> Men's Restroom 2-119 <br /> 1 . Inside face of Door 2- 119 door needs to be cleaned of water stains, dirt and debris. <br /> 2 . Top right Door 2- 119 hollow metal frame needs to be sanded and repainted where finish is damaged, <br /> rough and irregular. <br /> 3. Ceramic tile floor needs to be cleaned of dirt and debris. <br /> 4. Flush valve needs to be secured rightly to the wall is loose. <br /> 5. Lavatory sink needs to be cleaned of dirt and debris. <br /> 6. Cove base to the left of the Handi-cap water closet needs to be cleaned of dirt and debris. <br /> 7 . Escutcheon plate for flush valve at Handi-cap water closet needs to be set tight to the ceramic tile. Also, in <br /> this area, tile is chipped needs to be replaced at the opening. <br /> 8 . Above the water closet paint on the drywall finish needs to be removed . <br /> 9. At this panel above the paper towel holder needs to be repainted and caulked. <br /> 10. Ceramic tile base and ceramic tile floor in the Handi-cap area needs to be cleaned of caulking, dirt and debris . <br /> 11 . Ceramic tile base at boxed out column the grout joint has a void in it. <br /> 12 . Left inside corner of the north wall Handi-cap stall needs to be caulked of voids in the grout. <br /> 13 . Wall stop needs to be added to the Handi-cap toilet partition door. <br /> 14. A/C diffuser needs to be caulked where it abuts the drywall ceiling. That is also true of the drywall ceiling <br /> trim for the 2x2 light fixtures . <br /> 15. Plastic laminate toilet partitions need to be cleaned of paint overspray. <br /> Women's Restroom 2- 120 <br /> 1 . Left side hollow metal frame and drywall finish needs to be redone. <br /> 2 . Bottom left ceramic file needs to be cleaned of dirt and debris . <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />