My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263B
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:52:07 AM
Creation date
9/30/2015 11:02:44 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Administration Complex <br /> Bldg. 1 - 2nd Floor - West - Punch List <br /> Tuesday - 07/ 17/07 & Thursday -07/19/07 <br /> July 26, 2007 <br /> Page 9 <br /> Women's Restroom 2-120 (continued) <br /> 3. Floor needs to be cleaned of dirt and debris and ceramic tile needs to be cleaned of dirt, debris and drywall <br /> dust, etc. <br /> 4. Grout joint at the black accent trim tile above the cove base needs to be re-grouted. <br /> 5 . Left side of vanity sink above the ceramic file base, painter' s tape has been left in the drywall finish, this <br /> needs to be removed and repaired. <br /> 6. Drywall to the left of the front face of the vanity top or counter top, irregularity in the drywall finish needs to <br /> be patched and repaired. <br /> 7. Drain line covers at the sink drains need to be secured properly, they are not in place . <br /> 8. Floor tile needs to be cleaned of dirt and debris. <br /> 9. Ceramic tile around the electrical outlet to the left of lavatory in the Handi-cap stall needs to be repaired. <br /> 10. Right inside corner of ceramic tile on the drywall on the north wall painters tape left in the finish. Needs to he <br /> repaired . <br /> IRC Administration - Bldg 1 - 2"d Floor - West - Interior Punch List - (Continuation) Thursday - July 19, <br /> 2007 - 3:00 PM - Sunny/ Hot / Humid <br /> Reception Area 501 <br /> 1 . Door 501 A west edge of door above middle hinge, finish is chipped. <br /> 2 . Commission Office Sign A-501 on the glass, this is unacceptable. Back side of adhesive visible, needs to be <br /> corrected. <br /> 3. Hollow metal frame for Door 501 A, right side the side light underside of sill and drywall needs to be sanded, <br /> caulked and repainted. Also, left and right inside corners need to be sanded and repainted at the hollow metal <br /> frame. That is also true of the left side, double side lights, bottom inside corners of the frame need to be <br /> sanded and repainted. Underside of drywall needs to be sanded, caulked and repainted. <br /> 4. Drywall to the left of hollow metal frame imperfections needs to be sanded and repainted. <br /> 5. Vinyl base to the right of Door 501B not properly secured to the wall . <br /> 6. Door 501B, finish on the metal door frame needs to be touched-up with paint near lockset. <br /> 7. Side of door between middle and top hinge needs to be cleaned of paint. <br /> 8. Inside face of door to the right of hollow metal frame finish is damaged, also chipped in the hollow metal <br /> view light frame . <br /> 9. Left door 501B inside corner of vinyl base cut too short. <br /> 10. South wall center of the wall above the vinyl base approximately 12 inches imperfections in the drywall needs <br /> to be sanded and repainted. <br /> 11 . East wall far right light fixture not setting flush in the grid. Also, light fixture along the south wall parabolic <br /> lens is damaged. <br /> 12. Ceiling tile adjacent to the southern sprinkler head, tile is damaged . <br /> Open Area Corridor 502 — Waiting 503 - Open Office Area 509 <br /> 1 . At this time System Furniture in place throughout this area. <br /> 2. Right side of drywall opening leading to Door 503A drywall damaged, needs to be patched and repaired. That <br /> is true of the left side also. <br /> 3 . North wall in the god Work Station to the right of the drywall opening between Door 503A middle of the wall <br /> damaged, needs to be patched and repaired. <br /> 4. 3`d cubicle that eastern cubicle adjacent to the Commission Office Reception wall underneath the hook top <br /> counter, quad outlet needs drywall patched and repaired and data outlet 21D & 22D needs to be repainted <br /> around the perimeter. <br /> D O N A D I O <br /> & Associates, Architects, P.A . <br />
The URL can be used to link to this page
Your browser does not support the video tag.