Laserfiche WebLink
Indian River County Administration Complex <br /> Bldg. 1 - 2"d Floor East End Punchlist - Friday 04/06/07 <br /> April 16, 2007 <br /> Page 14 <br /> Work Room 306 (continued) <br /> 6. Boxed-out column area on the North wall right side edge up approximately 30" is chipped, needs to be <br /> repainted. Also, above the ceiling grid in this same area, it has drywall mud on it, needs to be cleaned. <br /> 7 . North wall, the Northwest inside corner, large area of drywall is missing, this needs to be patched and <br /> repaired in order to properly receive the vinyl base. <br /> 8 . To the right of Door 306, electrical outlet drywall has been patched, needs to be sanded and repainted. Also, <br /> to the right, the inside corner needs to be sanded and repainted, irregularity in the drywall, that is also true in <br /> this same area above the vinyl base. About half a dozen ceiling tiles are missing in this area. <br /> 9. Ceiling rile the 5`s full ceiling tile off the East wall at Door 306, the 4a full ceiling tile off the South wall . Tile <br /> is chipped at the corner. <br /> Reception Area 401 <br /> 1 . Door 401A — Door frame needs to be repainted and cleaned of adhesive and scratch marks on the door frame. <br /> 2. Hinge side of door frame adjacent to the bottom hinge is dented. Also, door is chipped on the inside face by <br /> the lock set location above it and to the left of outside edge. <br /> 3 . Vinyl base is installed in this area. Outside corners are pulling off the wall especially to right of Door 401A. <br /> 4. Bottom right of Door 401A where drywall abuts the metal door frame needs to be sanded, caulked and <br /> repainted. <br /> 5 . Accent wall east wall, chips in the paint need to be repainted. Also, there is some drywall patching that <br /> appears to have been done, this needs to be redone, patched repaired and repainted. Down to the right of Data <br /> I ID & 12D is a scuff mark on the accent color that needs to be repainted . <br /> 6. Drywall to the right of Door 402A, top right needs to be sanded and repainted. Paint is chipping. Also, vinyl <br /> base to the right is cut too short and the outside corner is not adhered. <br /> 7 . Top right of door 403A finish in metal frame is irregular needs to be sanded and repainted. That also is true of <br /> the drywall where it abuts the head of this door frame. <br /> 8 . Door frame 402A needs to be completely repainted on the bottom area left and right hand side. The hollow <br /> metal door the paint has been chipped. <br /> 9. To the right of Door frame 404A fingerprints on the drywall about mid door and also outside corner of the <br /> drywall needs to be repainted. <br /> Office 402 <br /> 1 . Inside bottom left of the door, chip in the door itself. <br /> 2 . Door frame needs to be cleaned of carpet adhesive and scratches in the paint. <br /> 3. Right side of door inside Office 402 drywall needs to be sanded, caulked and repainted. That is also true on <br /> the left side irregularities in the drywall. <br /> 4. Left side of Door 402, East wall appears to be overspray on the wall, this needs to be corrected. Also, on this <br /> same wall to the left of electrical outlet drywall needs to be sanded and repainted. Irregular. Also, about the <br /> middle of this same wall above the vinyl base irregularity in the drywall. <br /> 5 . North wall opposite Door 402A, drywall around electrical outlet needs to be sanded and repainted. Also , <br /> towards the West end of the wall above the vinyl base irregularities in drywall need to be patched, sanded and <br /> repainted. <br /> 6. West wall, right inside corner irregularities in drywall needed to be sanded and repainted . <br /> 7. South end of West wall above the vinyl base irregularities in the drywall needs to be sanded and repainted . <br /> Carpet adhesive needs to be removed and drywall around duplex electrical outlet needs to be sanded and <br /> repainted. <br /> S . Drywall around light switch cover very irregular needs to be sanded and repainted so the cover sets flush. <br /> 9. Vinyl base installed in this room. <br /> D O N A D I O <br /> & Associates. Architects, P.A. <br />