My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263E
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:56:50 AM
Creation date
9/30/2015 11:03:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
08/20/2007
Control Number
2007-263E
Agenda Item Number
County Administrator signature
Entity Name
Donadio & Associates
Subject
Punch List Bldg. 2 1st Floor West and Center Portion
Area
New County Administration Buiding #2
Supplemental fields
SmeadsoftID
6493
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Administration Complex <br /> Bldg. 2 - I st Floor Punch List - Friday - 06/29/07 <br /> July 09, 2007 <br /> Page 12 <br /> Receiving Room 221 (continued) <br /> 5. Right inside corner to the right of Door 221B is cracked, this needs to be caulked. <br /> 6. Cut out in masonry for light switch, data switches and electrical outlet are unacceptable, very rough and <br /> irregular, this needs to be redone. <br /> 7. Hallway leading to exterior Door 222A needs to be touched-up with paint above the ceramic tile in numerous <br /> areas where dirt and debris. <br /> 8 . Ceramic file is not finished grouting at exterior Door 222A, door needs to be repainted on the inside and <br /> hollow metal frame needs to be repainted. <br /> 9. Large stack of acoustical insulation stored in this area right now. <br /> 10. Transition strip needs to be installed between the ceramic file and the carpet at the area directly in front of <br /> Corridor 222 where it changes from carpet to ceramic tile in front of Door 220, 221 & 222. <br /> Open Work Area 223 <br /> 1 . Hollow metal Door 223 right side of door frame above them idle hinge is damaged. <br /> 2. Top of hollow metal door frame needs to be repainted. <br /> 3 . Bottom left of hollow metal door frame drywall needs to be sanded. <br /> 4. Inside face of Door 223 finish is damaged and that is also true of the bottom above and below the view light. <br /> 5. Drywall to the left of the hollow metal door frame above the vinyl base needs to be repainted. Also, hollow <br /> metal frame is dented just below the bottom hinge. <br /> 6. Drywall to the bottom left of Door 224 drywall needs to be sanded and repainted. <br /> 7 . Right of Door 224 hollow metal frame is not cut flush to the door frame. <br /> S . Vinyl base top edge between outside corner and the Door 224B drywall mud needs to be removed. <br /> 9. Hollow metal Door 224B needs to be repainted on the outside edges and at the head. <br /> 10. Stops for the pocket door needs to be painted and caulked. <br /> 11 . Inside head opening wood exposed, unacceptable. <br /> 12 . Acoustical grid along the wall at Door 224B , drywall mud the complete length needs to be cleaned and <br /> removed. <br /> 13. Inside corner to the left of the exterior window needs to be cleaned of drywall mud at the vinyl base. <br /> 14. Drywall below the window sill of exterior window to the bottom right towards the bottom left drywall is <br /> damaged, needs to be patched and repaired. <br /> 15. Anchor for the furniture systems has pulled the drywall where it has been secured underneath the window sill. <br /> 16. Right side jamb at the exterior wind needs to be repainted. <br /> 17 . Borrowed light 225 BL2 window frame needs to be sanded and repainted, rough and irregular at the bottom <br /> left at the jambs , etc. <br /> 18 . Four or five ceiling tiles not in place. <br /> 19. Borrowed light 225 BLl left side bottom left needs to be sanded and repainted and bottom left outside edge. <br /> 20. Drywall to the right approximately 8 inches off the bottom right comer needs to be sanded and repainted. <br /> Computer Room 225 <br /> 1 . Wood Door 225 side of door at the hinges is not finished. <br /> 2. Outside and inside face of Door 225 needs to be cleaned of dirt and debris . <br /> 3. Drywall above Door 225 needs to be repainted. <br /> 4. Right of Door 225 , FM 200 line coming up at the door needs to be relocated. It is in an improper location . <br /> 5 . To the right of borrowed light 225 BL2 outside corner of boxed in column this area needs to be patched, <br /> repaired, sanded and repainted. All chips, fingerprints, dirt, unpainted areas on the wall need to be sanded and <br /> repainted. <br /> 6. Top right of the hom strobe drywall needs to be repainted. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.