Laserfiche WebLink
Indian River County Administration Complex <br /> Bldg. 2 - 1st Floor Punch List - Friday - 06/29/07 <br /> July 09, 2007 <br /> Page 14 <br /> Work Room 228 (continued) <br /> 11 . Bottom left of door 209 , inside corner needs to be repainted. <br /> 12. Drywall below drinking fountains needs to be touched-up with paint. <br /> 13 . Drinking fountains need to be cleaned of dirt, debris and drywall mud. <br /> 14. Bottom left of door 209 vinyl base does not set flush to the drywall , needs to be removed and drywall sanded <br /> in and made smooth. <br /> 15 . Bottom right of hollow metal Door 209 needs to be sanded and repainted, finish is irregular and also chips in <br /> the hollow metal frame. <br /> 16. Hollow metal frame 230, outside edges where it abuts the drywall , needs to be sanded and repainted . Also, <br /> inside edges need to be sanded and repainted where it has been chipped. <br /> Men's Restroom 229 <br /> 1 . Light switch cover needed to the right of Door 229. <br /> 2. Hollow metal door frame top right needs to be sanded and repainted. <br /> 3. Door 229 needs to be cleaned of dirt and debris . <br /> 4. Paper towel holder needs to be caulked where it abuts the drywall finish. <br /> 5 . Ceramic tile needs to be cleaned of dirt and debris . <br /> 6. Ceramic tile where the drain lines penetrate need to be replaced, opening is cut large and irregular and not <br /> neat, not acceptable. <br /> 7 . Floor, wall tiles, etc, need to be cleaned of dirt and debris, not cleaned at this time. <br /> 8. All toilet accessories need to be caulked to the drywall finish. <br /> 9. Ceramic tile below Handi-cap lavatory opening cut too large where the drain lines penetrate the ceramic tile <br /> wall. <br /> 10. Walls and floors are full of drywall dust, etc. Needs to be cleaned. <br /> 11 . Grout in the ceramic tile around the toilet paper holder and the Handi-cap stall is irregular, unacceptable need <br /> to be redone and corrected. <br /> 12. South wall left inside comer where ceramic tiles meets the drywall, finish is irregular and rough, painters tape <br /> was left on the finish and the finish is not cut in tight to the ceramic tile. <br /> 13 . All toilet partitions need to he cleaned of drywall dust, dirt and debris . <br /> 14. Ceramic tile needs to be cleaned of all markers . <br /> 15 . Wall finish where it abuts the ceramic tile finish, tape has been left in throughout. <br /> 16. Finish on the paint has been left in place and tape cut in to the tile leaving the paint finish on the tape. All tape <br /> needs to be removed and finished patch is unacceptable. <br /> 17 . Drop ceiling needs to be touched-up with paint in numerous areas by the can lights. <br /> 18 . Center of dropped drywall ceiling paint finish again is irregular, painters tape left in place and finished over. <br /> 19. Ceiling grid has a mark on the finish, the ceiling gird just to the left of the vanity at the toilet partition screen <br /> support. <br /> Women's Restroom 230 <br /> 1 . Floors need to be cleaned, toilet partitions need to be cleaned, counter top and Restroom needs to be <br /> completely cleaned of drywall dust, dirt and debris. <br /> 2. Same issue as we had on Restroom 229 painters tape in place and finish applied over the painters tape at all <br /> inside corners at walls and ceilings and hollow metal door frames . <br /> 3 . Hollow metal door frame, inside face, needs to be repainted where the paint finish is damaged. <br /> 4. Light switch cover left off to the left of Door 230. <br /> 5 . Toilet accessories need to be caulked where they abut the finish. <br /> 6. Ceramic tile needs to be cleaned of dirt and debris . <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />