My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263E
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:56:50 AM
Creation date
9/30/2015 11:03:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
08/20/2007
Control Number
2007-263E
Agenda Item Number
County Administrator signature
Entity Name
Donadio & Associates
Subject
Punch List Bldg. 2 1st Floor West and Center Portion
Area
New County Administration Buiding #2
Supplemental fields
SmeadsoftID
6493
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Administration Complex <br /> Bldg. 2 - 1st Floor Punch List - Friday - 06/29/07 <br /> July 09, 2007 <br /> Page 6 <br /> Office 201 (continued) <br /> 6. To the left of hollow metal door frame 205B at the latching device height drywall is irregular, needs to be <br /> sanded and repainted. <br /> 7 . Hollow metal frame at the head stops for the pocket door needs to be caulked and repainted . Also, the head <br /> track for the pocket door is unacceptable, screws do not engage for the stops into anything and the exposed <br /> wood can be seen. <br /> 8. Drywall to the left of Door 205B and to the right of Data outlet 31/32 just above the vinyl base to the left and <br /> the right of the data outlet needs to be sanded and repainted. <br /> 9. Drywall around quad outlet to the left of the data outlet needs to be sanded and repainted. Drywall irregular. <br /> 10. Desk set in place in this room, unable to physical see condition of the wall at borrowed light 204 BLl . <br /> 11 . Drywall above light 204 BLl needs to be sanded and repainted at the hollow metal window frame . <br /> 12. Ceiling grid in front of Door 204A is chipped, that is the 2°d one off the exterior wall and the ls` the above the <br /> left side of the door. <br /> 13 . Ceiling grid the 1st ceiling grid off the south wall and 4`' full tile off the west wall, finish on the tile is <br /> damaged. <br /> 14. Ceiling tile ls` full tile off the east wall, 2"d full ceiling tile off the north wall tile is chipped. <br /> Work Room 203 <br /> 1 . This room is full of chairs from wall to wall. This room can not be completely punched out due to the chairs . <br /> Unable to access the borrowed light 203 BL from inside of Work Room 203 , needs to he punched out at a <br /> later date. <br /> 2. Door 203 - Hollow metal frame needs to be touched-up with paint inside and out. <br /> 3 . Inside top right corner of the door frame is bent. <br /> 4. Door 203A is a Dutch door, inside face of Dutch door shelf needs to be finished, unfinished at this time . <br /> 5 . Inside face of Door 203A, chips in the finish, top right at the dead bolt and lockset, etc. <br /> 6. Vinyl base to the left of Door 203 needs to be re-adhered. <br /> 7 . Left of Door 203A drywall needs to be repainted from the vinyl base up, insufficient coats of paint. <br /> 8 . Light switch covers and light finish device needs to be cleaned of paint. <br /> 9. Ceiling grid above 203A full of drywall mud and paint, this needs to be cleaned. <br /> Office 205 <br /> 1 . Desk has been set in place in this room. <br /> 2. View light in pocket door 205B has not been installed. <br /> 3 . Door 205A - Metal view light frame needs to be repainted, paint is chipping especially no paint on the screw <br /> head. <br /> 4. Outside face of door bottom edge needs to be cleaned of paint and finish has been chipped. <br /> 5 . Borrowed light 205 BL2 hollow metal frame needs to be touched-up with paint to the left jamb and top head <br /> and also drywall where it abuts the head of the frame needs to be sanded and repainted. <br /> 6. Hollow metal door frame 205A bottom right of the door is dented. <br /> 7. Vinyl base to the left of 205A needs to be cleaned and also inside comer needs to be repainted. <br /> 8. To the left of Door 205A drywall around electrical outlet needs to be repainted. <br /> 9. Left side of hollow metal door frame from the vinyl base up to the strike needs to be repainted and <br /> re-caulked. <br /> 10. Borrowed light 205 BL1 that is the narrow view light in the east wall of Office 205 , frame needs to be <br /> repainted completely. <br /> 11 . Two ceiling tiles misplaced at this time. <br /> 12 . Ceiling tile between boxed out column and A/C diffusers tile is chipped. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.