My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263E
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:56:50 AM
Creation date
9/30/2015 11:03:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
08/20/2007
Control Number
2007-263E
Agenda Item Number
County Administrator signature
Entity Name
Donadio & Associates
Subject
Punch List Bldg. 2 1st Floor West and Center Portion
Area
New County Administration Buiding #2
Supplemental fields
SmeadsoftID
6493
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Administration Complex <br /> Bldg. 2 - 1st Floor Punch List - Friday - 06/29/07 <br /> July 09, 2007 <br /> Page 7 <br /> Work Room 207 <br /> 1 . Hollow metal door frame 207 bottom left is dented. <br /> 2. Left side of Door 207 between the bottom hinge and the middle hinge edges are chipped. <br /> 3 . Inside face of Door 207 needs to be cleaned of dirt and debris. <br /> 4. Right of door 207 vinyl base needs to be cleaned of paint and drywall mud. <br /> 5. General areas throughout this room of the vinyl base needs to be cleaned of drywall mud, dirt, debris and <br /> paint. <br /> 6. Drywall around electrical outlet between the metal borrowed light 205 and borrowed light 204 needs to be <br /> patched and repaired . <br /> 7. Inside face of hollow metal door frame 204 BLl needs to be repainted on the bottom left edge. <br /> 8. West wall data outlet D04 drywall opening cut too large needs to be patched and repaired. <br /> 9. East wall electrical outlet cover plates not installed. <br /> 10. Electrical outlet to the right of north exterior wall and window drywall needs to be sanded and repainted. <br /> 11 . Six ceiling tiles not in place at this time/ <br /> 12 . Northeast inside corner ceiling tile has paint on it. <br /> 13 . Outside corner coming off of Door 207A is chipped and needs to be repainted in numerous areas. <br /> 14. Drywall on the outside of Door 207 top left corner needs to be repainted and the drywall where it abuts the <br /> header of the metal frame, door frame needs to be sanded and repainted. <br /> 15. Drywall around fire alarm horn strobe to the left of Door 207 opening cut tool large needs to be patched and <br /> repaired. Also, in this same area carpet glue on the walls. <br /> 16. Right of Door 207A outside corner vinyl base is not adhering. <br /> 17. Open alcove to the right of Work Room 207 furniture is installed completely in this area. Walls need to be <br /> touched-up with paint in numerous locations. <br /> 18. Back wall drywall needs to be patched and repaired around electrical outlet and electrical outlet cover needs <br /> to be set flush to the drywall. This is the Office Alcove between Work Room 207 and Office 210. <br /> 19. Above this area alcove two ceiling tiles missing not in place. <br /> 20. Left outside corner to the left of Door 210A fingerprints on the drywall needs to be repainted . <br /> Office 210 <br /> 1 . Door 210A - Bottom left of hollow metal door frame 210A is damaged. <br /> 2. To of hollow metal door frame where drywall abuts it needs to b sanded, caulked and repainted. <br /> 3 . Hollow metal door frame needs to be repainted from the floor up approximately 18 to 24 inches . <br /> 4. Inside face of Door 210 below the view light finish has been damaged, irregular. <br /> 5 . West wall above the vinyl base carpet glue on the wall . <br /> 6. Exterior window on the west wall right side drywall jamb needs to be repainted. <br /> 7 . North wall electrical outlet to the far right drywall around the outlet is irregular needs to be sanded and <br /> repainted. <br /> 8. Boxed out column drywall surface above the vinyl base needs to be repainted. Also, the outside corners <br /> where the vinyl base is not adhered to this outside column area. <br /> 9. Electrical outlet to the left f Door 210 the outlet device needs to be cleaned of paint and the outlet needs to be <br /> set plumb and level. <br /> 10. Two ceiling tiles not in place. <br /> 11 . Ceiling grid around the boxed out column is not setting flush to the drywall . Also, ceiling grid between the <br /> boxed out column and the north wall has paint on it, that is the grid along the wall. <br /> 12. Drywall to the right of Door 210 and to the Vestibule on Corridor 208 side needs to be patched and repaired <br /> above the vinyl base, drywall is damaged and also glue on the wall. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.