Laserfiche WebLink
Indian River County Administration Complex <br /> Bldg. 2 - 1st Floor Punch List - Friday - 06/29/07 <br /> July 09, 2007 <br /> Page 8 <br /> Vestibule 211 <br /> 1 . Transition strip needed between the ceramic tile and the carpet. <br /> 2. Right and left outside corners where the ceramic tile and vinyl base meet the transition is not acceptable. <br /> 3 . Floor tile is not grouted at the exterior door. <br /> 4. Top left comer and the drywall above the door to the left of exterior Door 211 A needs to be repainted. <br /> 5 . Outside edges drywall jambs leading to Door 211 need to be repainted. <br /> 6. Hollow metal door and frame inside face needs to be completely repainted. <br /> 7 . North wall around borrowed light 213 drywall needs to be touched-up with paint, fingerprints, dirt, chips in <br /> the paint. <br /> S. Borrowed light hollow metal frame 213 needs to be repainted at the head and the jamb and sill, in numerous <br /> areas outside edges are chipped and bottom right corner is dented. Also, edges /sides of the hollow metal <br /> frame where it abuts the drywall need to be sanded and repainted. <br /> Office 213 <br /> 1 . Bottom left of hollow metal Door 213 , hollow metal frame is damaged. <br /> 2. Hollow metal frame the strike side needs to be repainted, fingerprints all over the door. <br /> 3 . Drywall where it abuts the head of Door 213 needs to be sanded and caulked and repainted. That is the head <br /> and the top right jamb. <br /> 4. Bottom right inside corner within to the right of Door 213 drywall needs to be sanded and repainted. <br /> 5 . Drywall around hollow metal door frame at the head needs to be sanded, painted and re-caulked . <br /> 6. Top left corner of hollow metal borrowed light is damaged. <br /> 7. Drywall to the bottom hollow metal borrowed light, drywall needs to be patched and repaired. <br /> 8. Right inside comer above the vinyl base at the exterior wall needs to be sanded and repainted just above the <br /> base. <br /> 9. Drywall around the light switch needs to be sanded and repainted, very irregular. <br /> 10. Top left corner of hollow metal door frame 213 needs to be repainted. <br /> 11 . Drywall to the left of hollow metal door frame from the floor up to the strike needs to be sanded, caulked and <br /> repainted. <br /> 12. Two ceiling not in place . <br /> 13 . Ceiling grid above Door 213 needs to be cleaned of dirt. <br /> 14. Ceiling tile in the far northeast comer next to the return air grille is chipped. <br /> 15 . Outside wall of Office 215 to the right of Door 213 bottom right above the vinyl base pencil marks , paint on <br /> the wall needs to be repainted. <br /> 16. Electrical outlets between Door 213 and 214 drywall need to be sanded and repainted. <br /> 17. Drywall to the bottom left of Door 214 needs to be patched and repaired. <br /> Office 214 <br /> 1 . Hollow metal door frame 214 bottom left is damaged. Also, at the middle hinge. <br /> 2. Drywall to the left of door frame 214 needs to be sanded and repainted. That is also true of the head where <br /> the drywall abuts the hollow metal door frame head and the bottom right above the vinyl base. <br /> 3 . To the right of Door 214 inside the office area drywall and hollow metal frame needs to be sanded where it <br /> abuts the drywall approximately 12- 18 inches off the floor. Also, inside corner of vinyl base is not adhered <br /> and drywall in this area is very rough and irregular, needs to be sanded. <br /> 4. To the left of Door 214 paint needs to be removed from the electrical outlet cover and Johnson control box. <br /> 5 . Boxed out column outside edges need to be sanded and repainted there rough and irregular. Also, ceiling gird <br /> at this same boxed out column is not setting level to the ceiling and has drywall mud on it. <br /> 6. Three ceiling tiles not in place at this time. <br /> 7 . Ceiling gird to the left and 2°d grid to the left of the return air grille is damaged. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />