Laserfiche WebLink
Turner <br /> March 16, 2007 <br /> Mr. Steve Blum <br /> Project Manager <br /> Indian River County Administration Complex <br /> 2625 19th Avenue <br /> Vero Beach , FL 32960 <br /> RE : IRC New Admin Building <br /> 2625 19th Avenue <br /> Vero Beach , Florida 32960 <br /> Project #: 11531 <br /> Change Order Request Number COR-102 <br /> Scope Change <br /> Dear Mr. Blum, <br /> We have finalized gathering all the required quotations for PCO-110 for the following extra work: Revise Design in <br /> Commission Chambers . We have reviewed the Subcontractor Proposals (copies attached hereto) and have <br /> verified that all extra work items are in compliance with our Contract Agreement. The following is a detailed <br /> itemization of all extra costs: <br /> PCO No Item No Description Amount Contractor <br /> 110 001 Add black painted steel angle at bottom of Glass Handrail. $6, 143. COUIRO <br /> 110 002 Add chair rail and wood base at back wall of chambers. $1 ,000. Turner Estimate <br /> 110 003 Revise Drywall Ceilings and Partitions. $5,000 . Turner Estimate <br /> 110 004 Repaint Ceiling in Commission Chambers $ 1 ,000 . Turner Estimate <br /> 110 006 Provide Black Cloth at the ceiling openings between "Clouds" $ 1 , 000. Turner Estimate <br /> 110 009 Provide six (6) Plastic Access Doors in Carpet for Access to $ 1 ,500 Turner Estimate <br /> inside of Raised Flooring . Cut holes in Access Panel . <br /> 110 010 Revise lighting and power in Commission Chamber to $6,296. MILELE <br /> accommodate redesign . <br /> 110 012 Relocate two floor boxes for Light Fixtures on Wood Columns $ 1 ,250 . Turner Estimate <br /> in Commission Chambers <br /> 110 015 General Conditions @ 10% $22319 TURCON <br /> 110 017 Fee @4.25% of Total. $ 1 , 132 . TURCON <br /> 110 020 Release Contingency-Commission Chamber Revisions ($26 ,640 . ) - INDRIV <br /> Total Change to the GMP: $0.00 <br /> Note that most of the Work will be required to be performed on a T & M basis, since most of the Work needs to be <br /> worked out in the Field without specific Design Documents to Price. <br />