Laserfiche WebLink
Indian River County Administration Complex <br /> Bldg. 1 - 1st Floor - West - Punch List - Tuesday - July 24, 2007 <br /> August 02, 2007 <br /> Page 12 <br /> Open Office Area 418 <br /> 1 . Systems furniture completely installed in this area. <br /> 2. West wall of Office Area 416 needs to be sanded and repainted where it has been patched and repaired in <br /> numerous areas. <br /> 3 . Top left inside corner on exterior wall needs to be sanded, caulked and repainted. Also, about the middle of <br /> the inside corner needs to be repainted. <br /> 4. Right inside corner drywall jamb needs to be repainted and also the left inside and outside corners just above <br /> the window sill. Also, window sill needs to be cleaned of paint on the left edge and the front face . <br /> 5 . Window sill needs to be cleaned of paint on the left end and all the front face right side of the window sill . <br /> 6. Right and left inside jambs of the easternmost exterior window needs to be repainted. <br /> 7. Second exterior window coming off the west wall of Office 416, 5" ceiling grid coming off the left side of <br /> exterior window ceiling grid is damaged. <br /> 8 . Drywall between the 2n° and 3rd windows coming off the west wall of 416, drywall is damaged at the center <br /> of the wall, needs to be patched and repaired. <br /> 9. Window sill needs to be cleaned up of paint on the right side edge. <br /> 10. Left and right jambs need to be repainted, outside edges and where there is dirt and debris . <br /> It . Left jamb where it abuts the aluminum windows needs to be re-caulked, caulking is cracked . <br /> 12. Caulking where it abuts the aluminum window is very rough and irregular, needs to be re-done. <br /> 13 . Window sill needs to be cleaned of black scratches in the middle. <br /> 14. Third exterior window coming the west wall of 416, right edge of window sill needs to be cleaned of paint <br /> and drywall mud. <br /> 15 . Right drywall jamb needs to be touched-up with paint. <br /> 16. Left drywall jamb needs to be touched up with paint and left inside corner between the drywall and the <br /> aluminum frame needs to be re-caulked, caulking is cracked. <br /> 17 . Fourth exterior window to the west of Office 416 right and left side edges needs to be cleaned of drywall <br /> mud . <br /> 18 . Bottom left drywall jamb needs to be repainted and also bottom right needs to be patched and repaired, <br /> damaged, indentations in the drywall . <br /> 19. Top left of aluminum window needs to be cleaned of paint. <br /> 20. Ceiling tile coming off the left window pane of the 4 ° exterior window to the left of Office 416, tile is <br /> chipped . <br /> 21 . Drywall jamb at the aluminum window ahs pulled away from the aluminum window that is the 5'' window to <br /> the west of Office 416 or westernmost window approximately 1 /4- 1/8 inch of a gap between the drywall and <br /> aluminum window, this needs to be corrected. It also occurs at the head on the left side. <br /> 22. Drywall jamb right and left sides needs to be repainted. <br /> 23 . Dropped header between Open Office Area 418 and Work Room 421 underside needs to be cleaned of <br /> drywall mud . <br /> 24 . South wall of Projection Area directly opposite Open Office Area 418 needs to be sanded and repainted where <br /> it has been touched-up with paint. Also, drywall mud needs to be removed from the vinyl base. <br /> 25 . Ceiling grid above wall leading into the Production 420 needs to be cleaned of drywall mud and paint. <br /> 26. Ceiling tile above Sign 420 for Production Room is chipped. <br /> Open Office Area 419 <br /> 1 . East wall left outside corner of Production Area 420 needs to be sanded and repainted where it has been <br /> touched-up with paint around the fire alarm horn strobe. Also, drywall mud needs to be removed from the <br /> vinyl base. <br /> 2. Furniture installed in this area. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />