Laserfiche WebLink
Indian River County Administration Complex <br /> Bldg. 1 - lst Floor - West - Punch List - Tuesday - July 24, 2007 <br /> August 02, 2007 <br /> Page 6 <br /> Staging Area 406 (continued) <br /> 13. Ceiling tile is damaged that is the 2°° and 4" ceiling tile coming off the left side of the 2nd can light. That is <br /> the 2°d can light to the left or to the west of the coral cast column in front of Customer Service 405 . <br /> 14. Debris in grid, that is the 4 h ceiling tile coming off the drywall header above the Reception counter for 406 <br /> and the 2°d tile coming off the left corner of the Stairs 003 , debris in the grid. <br /> 15 . Ceiling tile chipped the 2nd ceiling tile coming off the wall of Stairs 003 and the 5`h ceiling tile off the exit <br /> light of Door 405B . <br /> Customer Service Area 407 <br /> 1 . Door 407B does not completely open or close, this needs to be adjusted, real hard to pull on the track. Also, <br /> finished material exposed drywall from the head needs to be painted out. <br /> 2. Top right inside corner of door 407B needs to be caulked and repainted at the right inside corner. <br /> 3 . Top of Door 407 hollow metal frame where it abuts the drywall needs to be sanded, caulked and repainted. <br /> 4 . Left of Door 407B above the vinyl base, a nick in the drywall needs to be patched and repaired. <br /> 5 . Furniture installed at this location. <br /> 6. Ceiling tile to the left or in front of the coral cast column right off the drywall header is damaged. <br /> 7. Drywall header over Customer Service counter, vertical face needs to be repainted where there is white paint <br /> on the face and right and left hand side corners need to be cut in neatly. <br /> 8 . Patched areas to the right of Door 407A need to be touched-up with paint where they have been patched . <br /> 9. Screw missing in the cover plate for the light switch. <br /> 10. Top right corner of hollow metal frame where it abuts the drywall , drywall needs to be patched and repaired . <br /> 11 . Door 407A needs to be adjusted to open and close properly and pocket door frame does not close all the way. <br /> 12 . West wall right side to the right of the raised electrical outlet, patches on the drywall need to be and repainted . <br /> 13 . Irregularities above the vinyl base in numerous areas at the center of the wall above the vinyl base needs to be <br /> sanded and repainted. <br /> 14. Bottom left of Door 407D voids in the hollow metal frame meets to the drywall and the vinyl base need to be <br /> filled in. Vinyl base cut tight to the frame. <br /> 15 . Stops at the head of the pocket Doors 407A & B need to be repainted. <br /> 16. Ceiling tile at the back right sprinkler head, debris in the grid needs to be patched and repaired. Also, in this <br /> same location at the wall drywall is damaged or debris on the wall needs to be cleaned and repainted. <br /> 17 . Ceiling tile along the back wall, the west wall, V ceiling tile and 5m ceiling tile off of door 407B, fingerprints <br /> and damaged tile. <br /> 18. Ceiling 2x4 light fixture, the middle light fixture, Is' one coming off the drywall header, parabolic lens is <br /> damaged . <br /> 19 . Ceiling grid, the 4`h grid coming off the south wall and the 5 h ceiling tile coming off the drywall header, <br /> finish is damaged on the grid. <br /> Office 408 <br /> 1 . Hollow metal frame for view light in Door 408A needs to be touched-up with paint at and bottom left <br /> adjacent to frame and bottom right inside jamb. <br /> 2. Bottom side of door strike side needs to be cleaned of paint. <br /> 3 . Top left edge of door on the inside face finish is chipped at he edges, top left and top right and the sides above <br /> and below the top hinge . <br /> 4. Right of door 408A drywall needs to be patched and repaired above the vinyl base. <br /> 5 . Right side of hollow metal frame at the drywall around the middle hinge needs to sanded, caulked and <br /> repainted. That is also true of the right inside corner from the top of the hollow metal frame up. <br /> 6. Top of door and side light 408A where it abuts the drywall needs to be sanded, caulked and repainted. <br /> DONADIO <br /> & Associates, Architects, P.A. <br />