My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2016 12:53:18 PM
Creation date
9/30/2015 11:02:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/20/2007
Control Number
2007-263
Agenda Item Number
County Administrator Signature
Entity Name
Turner Construction
Subject
Certificate of Substantial Completion
Area
New County Administration Bldg.
Supplemental fields
SmeadsoftID
6488
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Administration Complex <br /> Bldg. 1 - 1 st Floor - West - Punch List - Tuesday - July 24, 2007 <br /> August 02, 2007 <br /> Page 7 <br /> Office 408 (continued) <br /> 7. Drywall to the bottom left of Door 408 above the vinyl base along the complete length of the side light needs <br /> to be sanded and repainted. That is also true of the underside of the window of hollow metal frame. <br /> 8. East wall above the vinyl base between the electrical outlet and the left inside corner drywall needs to be <br /> patched and repaired where areas have been marked in pencil. That is also true of the left inside comer. <br /> 9. North wall drywall needs to be sanded, patched and repaired where areas have been circled in pencil around <br /> the data outlet above the vinyl base along the whole length of the wall. <br /> 10. West wall drywall needs to be sanded, patched and repaired where areas have been circled in pencil around <br /> electrical outlets above the vinyl base at the right inside corner of the west wall around electrical outlet and <br /> the light switch. <br /> 11 . Fingerprints on the wall to the right of Door 408B needs to be touched-up with paint. <br /> 12 . Top head of Door 408B where it abuts the drywall needs to be sanded, caulked and repainted . <br /> 13. Ceiling tile coming off the right comer of Door 408B stain in the tile. <br /> 14. Drywall to the left inside corner of door 408B needs to be sanded, patched and repainted where it has been <br /> marked in pencil. <br /> 15 . South wall below borrowed BLl 408 drywall needs to be sanded and repainted on the bottom right and <br /> bottom left and underneath the window where marked in pencil . That is also true of the top right corner and <br /> the top left comer. <br /> 16 . Hollow metal frame BLl 408 needs to be sanded, caulked and repainted where the bottom of the window <br /> abuts the drywall . <br /> 17 . Borrowed light BLl 408 bottom left face of the frame and stop middle face of the frame and stop and the right <br /> needs to be sanded and repainted, finish is rough and irregular. <br /> 18. Center mullion between the two borrowed lights BLl 408 panes eye level scratches in the metal need to be <br /> patched and repaired . <br /> 19. Drywall to the left of BLl 408 needs to be touched-up, sanded and repainted where it has been circled in <br /> pencil . <br /> 20. Ceiling tile to the top left of Door 408A scratched. <br /> 21 . Ceiling tile chipped, the 3`d ceiling tile coming off the center of the BLl 408 hollow metal borrowed light <br /> between the supply grille and the return air grille. <br /> Open Office Area 409 <br /> 1 . Furniture installed in this area. <br /> 2. Free standing column needs to be sanded and repainted where it has been circled with pencil around the <br /> complete perimeter above vinyl base to outside corners. <br /> 3 . Drywall to the bottom right of hollow metal frame 408B drywall needs to be patched and repaired. <br /> 4. Top edge of hollow metal frame where drywall abuts the frame needs to be sanded caulked and repainted. <br /> 5 . Left of 408, drywall needs to be sanded, patched and repaired where ever it has been circled in pencil . <br /> 6. Third full ceiling tile coming off the right corner of the free standing column, stain on the tile, east space of <br /> the free standing column. <br /> Conference Room 411 <br /> 1 . Bottom left of hollow metal frame411B , frame is damaged, needs to be sanded, patched and repaired. <br /> 2. Bottom right of Door 441B paint on the door finish and also on the bottom left face. <br /> 3 . Top right corner of hollow metal frame 411 B is dent. <br /> 4. Drywall below the right top hinge needs to be repainted at the hollow metal jamb, semi-gloss paint on the <br /> finish. <br /> 5 . Underside of hollow metal windows between Door 401A and 411A & B needs to be sanded, caulked and <br /> repainted where it abuts the drywall. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.