My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-289
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-289
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2016 2:10:40 PM
Creation date
9/30/2015 9:03:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
08/23/2005
Control Number
2005-289
Agenda Item Number
11.C.2
Entity Name
Turner Construction
Subject
Amendment No. 2 - Guaranteed Maximum Price
Area
New County Administration Complex
Supplemental fields
SmeadsoftID
5140
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Turner <br /> Administration Complex <br /> Final GMP Summary <br /> Qualifications & Assumptions <br /> Report Date : August 16, 2005 <br /> Bid Package 15a HVAC & Plumbing <br /> Specifications : <br /> 1 Ref , Equipment Sections 15035 , 15440 , 15680 , 15740 , 15760 , 15800 , 15860 , 15850 and <br /> 15930 : The GMP is based upon non -proprietary design or equipment manufacturers . <br /> 2 Ref . Section 15400 - 2-2 . 02 : Piping for well water is the same as specified for domestic <br /> water pipe . <br /> 3 Reference Section 15410 -4 -2 . 07 . A . 1 & 2 : Insulation of domestic cold water piping is not <br /> included in the GMP . <br /> 4 Ref . Section 15880 -3 - 2 . 05 . A : The GMP includes fourteen ( 14) motorized dampers for the <br /> FM200 fire suppression system . <br /> Drawings : <br /> 1 Ref . 0- P6 . 1 . 0 : The GMP includes a well water system for Building Two used as a <br /> secondary system in case of a power failure . <br /> 2 Ref . 1 - P1 . 1 . 1 : The GMP includes an allowance of $35 , 000 for kitchen plumbing and <br /> ventilation roughin and final connections to equipment ( not shown , provided by Owner) for <br /> Building One . <br /> 3 Ref . 0 - M3 . 1 and 0 - M3 . 2 : The Mechanical Equipment Schedules identify manufacturers <br /> only as a basis of design . The GMP is based on non -proprietary design and equipment <br /> manufacturers . <br /> 4 Ref 2- M1 . 1 . 2 : The GMP includes fuel oil supply and return piping from storage tank to <br /> daytank in Building 2 . <br /> 5 Ref 2- M1 . 1 . 2 : The GMP includes one ( 1 ) 4000 gallon double wall above ground fuel <br /> storage tank with automatic leak detection and two (2 ) day tanks for generators . <br /> Addendum # 1 plan shows a 4000 gallon tank but the detail on same drawing shows a <br /> 8000 gallon tank. <br /> 6 Ref 2- M1 . 1 . 2 : The GMP includes initial fuel fill of 4550 gallons , including daytanks for <br /> testing purposes . Storage tank only will be filled for Owner prior to turnover . <br /> 7 Drilling of well for well water system and pumps for well (s) is included in the Landscape <br /> package for Building Two only . <br /> 8 The GMP excludes the following : <br /> a . Sand/oil interceptor for loading dock or garage . <br /> b . Heat tracing for exposed piping . <br /> c . Natural gas piping . <br /> d . Fuel oil supply and return piping from Building 2 storage tank to Building One day <br /> tank . No storage tank is included at Building One . <br /> e . Building One well water system . <br /> f . Carbon monoxide detection system . <br /> Page 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.