Laserfiche WebLink
IRC Administration Complex <br /> Property Appraisers Office - Punch List - Friday - 07/06/07 <br /> July 10, 2007 <br /> Page 5 <br /> Office 609 <br /> 1 . Office furniture is installed in this office at this time. <br /> 2. Office Door 609 needs to be cleaned of dirt and debris on both sides. <br /> 3 . Bottom right and left hollow metal frame needs to be cleaned of carpet glue and edges need to be repainted <br /> where they have been damaged. <br /> 4. To the right of the hollow metal frame, on the Corridor side, drywall needs to be sanded and repainted. <br /> Irregularities in the drywall. <br /> 5 . Left side of hollow metal door frame needs to be sanded and repainted about the strike locations. <br /> 6. Right side of hollow metal frame 609 needs to be sanded and repainted from the top right edge of the hollow <br /> metal frame down to the vinyl base. <br /> 7. Inside hollow metal frame top right corner is bent and right edge of hollow metal frame needs to be sanded <br /> and repainted. Bottom right and left portions of the frame, carpet glue is on the frames. <br /> 8 . Interior face of Door 609 needs to be cleaned of carpet glue. <br /> 9. Vinyl base needs to be cleaned of paint on the top edge. <br /> 10. Electrical outlet on the west wall Of Office 609 drywall needs to be sanded and repainted around the outlet <br /> cover. <br /> 11 . Right side jamb of exterior window needs to be repainted. <br /> 12. Window needs to be cleaned of paint at the aluminum frame. <br /> 13. Window sill on the left edge needs to be re-caulked. <br /> 14. Ceiling grid to the right of A/C diffuser is chipped. <br /> 15 . 2x4 light fixture in front of exterior window lens is damaged. <br /> Open Office Area 610 <br /> 1 . Office furniture is installed in this office at this time. <br /> 2. Exterior wall below the exterior window carpet glue needs to be removed from the paint and paint refinished. <br /> 3 . To the left of the exterior widow on the exterior wall drywall mud needs to be cleaned off the wall and <br /> repainted. <br /> 4. Right side of exterior window needs to be sanded and repainted below the window sill at the exterior wall <br /> location and to the right where the drywall wall intersects the window at the jamb. <br /> 5 . Right side of exterior window drywall jamb, outside edge of the perpendicular wall abutting the drywall, <br /> window jamb needs to be sanded and repainted completely including the top inside corner and left drywall <br /> jamb of exterior window needs to be repainted. <br /> 6. Electrical outlet on the west wall drywall around the outlet cover needs to be sanded and repainted and also to <br /> the right of the outlet, irregularity in the drywall needs to be sanded and repainted. <br /> 7 . Two ceiling tiles not in place in this area. <br /> Office Area 611 <br /> 1 . Office furniture is installed in this office at this time. <br /> 2. Exterior drywall above Door 611 needs to be repainted and also to edge where the drywall meets the hollow <br /> metal frame needs to be sanded, caulked and repainted . <br /> 3 . Right side jamb of hollow metal Door 611 inside the office needs to be sanded, caulked and repainted. Very <br /> rough and irregular. <br /> 4 . Electrical outlet to the right of Door 611 drywall needs to be sanded and repainted around the outlet cover and <br /> to the right of the outlet cover. <br /> 5 . Top left inside jamb of the easternmost exterior window needs to be sanded and repainted. <br /> 6. Window sill of this same eastern exterior window needs to be cleaned of paint. <br /> 7 . Western window, in this office, top right and left corners need to be sanded and repainted and also, hollow <br /> metal frames in the top right and left corner needs to be cleaned of drywall mud. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />