Laserfiche WebLink
IRC Administration Complex <br /> Property Appraisers Office - Punch List - Friday - 07/06/07 <br /> July 10, 2007 <br /> Page 6 <br /> Office Area 611 (continued) <br /> 8 . Right jamb of westernmost exterior window needs to be cleaned of paint and re-caulked . <br /> 9 . Left jamb at the window sill needs to be caulked and repainted . <br /> 10. Underside of window sill right inside corner needs to be caulked and repainted. Also the inside corner of the <br /> drywall where the exterior wall meets the interior wall needs to caulked, sanded and repainted . <br /> 11 . Exterior wall left inside comer at the jog drywall mud on the grid along the whole wall and the inside corner <br /> needs to be cleaned. <br /> 12. Ceiling tile, the 2°d full ceiling tile off the Corridor wall to the right of Door 611 and the 1 " ceiling tile off the <br /> east wall, tile is damaged . <br /> 13. Ceiling tile, I " full ceiling tile coming off the left comer of Door 611 , edge is chipped. <br /> Conference Area 612 & 613 <br /> 1 . Exterior Door 612 top right corner at corridor side finish on hollow metal frame is rough and irregular needs <br /> to be sanded and repainted. That is also true of the outside face just below the middle hinge. <br /> 2. Bottom right face of hollow metal frame id dented. <br /> 3 . This door frame needs to be completely repainted, extensive marks and chips. <br /> 4. Outside face on the Corridor side the drywall needs to be sanded where it abuts the hollow metal frame at the <br /> head and caulked and repainted. <br /> 5. Finish on Door 604 is damaged right above the lockset, escutcheon plate and also on the right side in line with <br /> middle hinge and above the middle hinge finish is scratched. <br /> 6. Bottom left comer drywall needs to t touched up with paint to the left of Door 612. <br /> 7. Right side of Door 612 hollow metal frame below and above the light switch cover plate needs to be sanded <br /> and repainted, irregular. <br /> 8 . Drywall around the light switch plate to the right of Door 612 needs to be sanded and repainted. <br /> 9. Door 613A — Drywall at the head of Corridor side of Door 613A needs to be sanded, caulked and repainted. <br /> 10. To the left on the exterior corridor side the vinyl base to the left of Door 613A is cut too short. <br /> 11 . Drywall above the hollow metal window opening at 613 BLl needs to be sanded and repainted above the <br /> hollow metal frame. <br /> 12. Bottom right and right side of hollow metal borrowed light 613 needs to be sanded and repainted, drywall is <br /> very irregular. <br /> 13 . Top left corner of hollow metal frame to Door 613 needs to be sanded and repainted at the frame, finish is <br /> irregular. Also, to the right of the door frame from floor to top comer of the door needs to be sanded and <br /> repainted. <br /> 14. Top left corner of borrowed light 615 BLl needs to be sanded and repainted. <br /> 15. Bottom left corner of BL light 613 needs to be sanded and repainted at the drywall . <br /> 16. Underside of borrowed light 613 BLl the complete length of the widow where the drywall abuts the hollow <br /> metal frame needs to be sanded, caulked and repainted the complete length. Also, in this same area drywall <br /> above the vinyl base is very rough and irregular, needs to be sanded and repainted. <br /> 17 . Inside Office Area hollow metal borrowed light BLl 613 needs to be sanded and repainted where tit abuts the <br /> drywall. Also, left jamb needs to be completely repainted. <br /> 18. Drywall to the left of the left jamb of borrowed light BLl 613, drywall has pin holes in it between the <br /> borrowed light and the light switch cover. Needs to be sanded and repainted . <br /> 19. Light switch and electrical outlet between Door 613 and borrowed light 613 needs to have paint removed. <br /> 20. Drywall where it meets the head of borrowed light 613 BL 1 needs to be sanded, caulked and repainted the <br /> complete length. <br /> 21 . Underside of borrowed light 613 BLl where the drywall meets the sill of BLl needs to be sanded, caulked <br /> and repainted completely. <br /> 22. Drywall above the vinyl base below borrowed light BL] 613 needs to be sanded and repainted. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />