My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-315
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-315
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2016 12:20:08 PM
Creation date
9/30/2015 11:18:07 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/18/2007
Control Number
2007-315
Agenda Item Number
7.Y.
Entity Name
Wells & Water Systems, Inc.
Subject
Public Supply Wells Construction and Testing
Area
North County Wellfield
Bid Number
2007044
Supplemental fields
SmeadsoftID
6606
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 EXECUTION <br /> 3 . 01 INSTALLATION OF PUMPING EQUIPMENT <br /> A . The pump, flow measuring device(s) , discharge piping, access pipe/air-line, and other <br /> necessary appurtenances shall be installed for the well pumping test. <br /> 3 . 02 PRELIMINARY CAPACITY PUMPING TEST <br /> A . Run a preliminary capacity pumping test prior to the pumping tests . The preliminary <br /> capacity pumping test shall be conducted to establish rates and evaluate equipment <br /> performance, including discharge capacity, and to estimate the production capacity of <br /> the well prior to implementation of the step drawdown test. Operate the pumping test <br /> equipment continuously at such rates of discharge and for such period of time as <br /> determined by the ENGINEER. Duration of such preliminary test shall be <br /> approximately 1 hour. <br /> B . Unless otherwise approved by the ENGINEER, the preliminary capacity pumping test <br /> shall be conducted on the day preceding the pumping test . <br /> C . The static water level in the well shall be allowed to recover for a minimum time equal <br /> to the duration of the preliminary test before start of well pumping test or longer as <br /> determined by the ENGINEER. <br /> 3 . 03 PUMPING TEST <br /> A . Operate the variable-rate step-drawdown and aquifer performance pumping test <br /> equipment continuously at such rates of discharge and for such period of time <br /> prescribed by the ENGINEER. <br /> B . The CONTRACTOR shall provide an operator during the entire time the pump is in <br /> operation, as required by the ENGINEER, to operate the prime mover and to regulate <br /> the discharge by the throttling device during the test pumping period. <br /> C . The CONTRACTOR shall collect a water sample from the spigot on the discharge <br /> pipe between the 6th and 8th hour of the pumping and submit the sample to the selected <br /> laboratory for analysis of the following parameters : <br /> • Select primary drinking water standard listed in Chapter 62-550, F.A. 0 <br /> including inorganic compounds (Table 1 ) , volatile organic contaminants <br /> (Table 4), synthetic organic contaminants (Table 5), Total coliform , and <br /> radionuclides (Combined radium-226 and radium-228 and Gross alpha <br /> particle activitiy; <br /> • All secondary drinking water standards (Table 6) listed in Chapter 62-550, <br /> F. A .C . ; <br /> PUMPING TEST <br /> 02200-3 <br /> Ct\DOCUME- 1 \mikeh\LOCALS—I \Temp\Temporary Directory 19 for TRC wells Div Lzip\I0-TRC_Pumping test.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.