and applicable construction details . <br /> The CONSULTANT will submit two sets of technical specifications at the 60 percent <br /> completion level . The 60 percent submittal will include a table of contents and a <br /> preliminary draft of all the required technical specification sections . <br /> 3.2 90 Percent Design <br /> The 90 percent level of completion is defined as the incorporation of all County <br /> comments received and verified after the 60 percent review with the County together <br /> with additional improvements to the drawings by the CONSULTANT . The drawings will <br /> be at a level of completion that will allow the project to be bid . The CONSULTANT will <br /> submit two sets of technical specifications and drawings at the 90 percent completion <br /> levels . The CONSULTANT will prepare and submit an Engineer's Opinion of Probable <br /> Construction Cost for the project. The CONSULTANT will meet with the County to <br /> discuss the submittal , prepare and submit a written list of County comments , and <br /> subsequently revise the drawings per the County's comments . <br /> 3.3 Preparation of Permit Applications <br /> The CONSULTANT will prepare and submit the necessary permit applications. The <br /> CONSULTANT will respond to all requests for additional information from permitting <br /> agencies. The County will pay the fee for all permits . The CONSULTANT recognizes <br /> that time is of the essence with respect to submittal of permit applications and <br /> subsequent responses to agency questions and therefore , will attempt to expedite the <br /> permitting process by working closely with all permitting agencies . <br /> 3.4 100 Percent Design <br /> At the 100 percent submittal , two sets of the drawings will be submitted together with <br /> one copy of an electronic AutoCADTM format of the drawings . The 100 percent <br /> submittal will also include bid schedule , table of contents , and technical specifications in <br /> electronic Microsoft Word TM format and two printed sets of said documents . The <br /> CONSULTANT will prepare and submit an Engineer's Opinion of Probable Construction <br /> Cost for the project at the 100 percent design level . <br /> 4. 0 MEETING ASSISTANCE <br /> The CONSULTANT will prepare a presentation board of the stormwater project to use <br /> at a single public meeting and at a separate meeting with pertinent City of Vero Beach <br /> and County staff. The CONSULTANT will attend both meetings and prepare the <br /> minutes of the meetings. Meeting minutes will be distributed to the County by the <br /> CONSULTANT . <br /> 5. 0 BIDDING ASSISTANCE <br /> The following scope of services outlines the tasks to be completed by the <br /> CONSULTANT during the bidding phase . The County will advertise the construction <br /> 4 <br /> P:�2240016 IRC Rockridge PDR\WORK ORDER#3RR\Work Order #3-RR - October 10, 2006.doc <br />