Laserfiche WebLink
be responsible for removing, in their entirety, all construction stakes, ranges, and <br /> other devices utilized to delineate the beach construction template. The <br /> CONTRACTOR shall record all stakes deployed and removed on a daily basis on a <br /> Construction Stake Inventory . <br /> 31 . CONSTRUCTION <br /> 31 . 1 Debris. Prior to placement of fill, the CONTRACTOR shall remove from the beach <br /> fill area of the work all driftwood, rubble, and other debris lying within the <br /> foundation limits of the beach fill section. All materials removed shall be disposed of <br /> in an appropriate and legal manner and at the expense of the CONTRACTOR. <br /> Grading and other construction equipment shall not be permitted outside the <br /> construction limits except for ingress to or egress from the site via the designated <br /> mobilization areas. <br /> 31 .2 Lines and Grades. The excavated material shall be placed on the beach to the lines, <br /> grades, and cross-sections indicated in the Plans, unless otherwise directed by the <br /> COUNTY. The fill profile shall be the same as indicated on the Plans. The <br /> CONTRACTOR is to place the fill on the beach in such a manner as to establish a <br /> uniform and straight beach between adjacent pay profile lines . The COUNTY <br /> reserves the right to vary the width or grade of the berm from the lines and grades <br /> shown on the Plans or observed at the project site in order to establish a uniform <br /> beach between adjacent pay profile lines or for the entire length of the project. The <br /> beach fill cross-sections shown on the Plans are for the purpose of estimating the <br /> amount of fill needed and shall be used by the COUNTY in making any change in the <br /> lines and grades. <br /> 31 .3 Dikes. Temporary longitudinal dikes and spreader and pocket pipe shall be used as <br /> necessary to prevent gully formation and erosion of the beach and fill, to retain the fill <br /> on the beach within the limits of the fill template cross-section, and to minimize and <br /> control water turbidity. Dikes or mounds shall be constructed along the waterline as <br /> necessary and/or as required by the permits to direct the pipeline discharge <br /> longitudinally along the beach for the purpose of minimizing transverse gully <br /> formation from the point of discharge. The COUNTY may direct the <br /> CONTRACTOR to extend dikes, if necessary, to control turbidity or beach erosion at <br /> no additional cost to the COUNTY. The CONTRACTOR shall not permit <br /> wastewater to flow landward of the fill section, or water to form ponds between the <br /> fill and upland areas. The CONTRACTOR shall protect existing drainage operations. <br /> Any material permitted to flow into or restrict the flow of an existing ditch; canal , or <br /> drain pipe, shall be promptly removed. Structures within the fill section shall be <br /> protected by the CONTRACTOR to prevent potential damage by the <br /> CONTRACTOR's operations. <br /> 31 .4 Grading and Dressing. Upon completion of all filling operations within an <br /> acceptance section, the fill shall be graded and dressed so as to eliminate any <br /> undrained pockets, ridges, and depressions in the beach fill surfaces and as necessary <br /> TECHNICAL AND ENVIRONMENTAL SPECIFICATIONS Rev October 5, 2007 TS-29 <br />