Laserfiche WebLink
DEP Permit No . : 0166929-010-EM <br /> If the material sampled on an hourly basis, as outlined in the Monitoring and Reporting <br /> section of this Plan, does not appear to meet the material quality standards as outlined by <br /> Rule 6213-410007(2)(j) , F .A.C . , the Site Representative will immediately notify the <br /> Project Engineer. The dredge will be directed to an area of clean sand, and the <br /> noncompliant material will be placed seaward of the constructed MLW waterline. The <br /> DEP will be notified of the time and amount of dredged material that was found to be <br /> noncompliant, as well of the corrective actions exercised by the Site Representative and <br /> Project Engineer. <br /> 6 <br />