Laserfiche WebLink
DEP Permit No. : 0166929-010-EM <br /> Indian River County, Florida <br /> Shore Protection Project - Sectors 1 and 2 <br /> Borrow Area Sediment Quality Control Plan <br /> The County and the Engineer will enforce the relevant Terms and Conditions of the <br /> Contract Documents and the related permits throughout the construction process. The <br /> Contractor shall be required to comply with all Terms and Conditions of the Contract <br /> Documents and the related permits and shall comply with the Quality Control Plan as <br /> detailed herein. <br /> The County's Site Representative shall communicate daily (or on an event basis as <br /> needed) with the Contractors designated and responsible Site Representative the results <br /> of the sediment quality testing. Should sediment characteristics on the beach fill section <br /> in progress dictate corrective action, the Contractor's designated representative shall have <br /> the authority to alter dredge operations and/or beach fill placement grading to ensure <br /> compliance with the provision of the issued permit and this document. <br /> The Quality Control Plan for the borrow area has the purpose of ensuring that sediment <br /> from the permitted borrow area meets the material quality standards as outlined by Rule <br /> 62B-41 . 007(2)0), F.A.C. and specifically that the Contractor stay within the borrow area <br /> limits as outlined in the Permit and in the Contract Plans and Specifications. <br /> Sediment Excavation <br /> In order to achieve the sediment quality requirements as outlined herein, a specific <br /> borrow area cut geometry for both the offshore and Sebastian Inlet Sand Trap sites was <br /> developed based on extensive field evaluations and detailed geotechnical analysis. The <br /> results of these analyses are identified in the Contract Documents (Plans and <br /> Specifications). The borrow area geometry as identified in the figures shows the limits of <br /> the borrow area. Additionally, a magnetometer survey has identified anomalies within <br /> the borrow area and a dredge exclusion area is represented in Figures 1 and 3 . The <br /> dredge shall not operate within the identified Dredge Exclusion Area. The elevations <br /> (depths) of the cuts within the Primary and Secondary Borrow Areasare -31 feet NGVD <br /> and -30 feet NGVD, respectively and as identified in Figures 2 and 4; this depth includes <br /> a -2 foot overcut allowance. <br /> The Sebastian Inlet Sand Trap and its cut geometries are shown in Figures 5 and 6 . The <br /> borrow area has multiple cut geometries, which should minimize the potential of <br /> encountering rock. The depth of the cuts verify from - 11 feet NGVD to - 16 feet NGVD . <br /> The Contractor shall not excavate material from outside the horizontal or vertical dredge <br /> delineations. <br /> Excavation shall not extend below the allowable depth or within the dredge <br /> exclusion area, and shall not occur outside of the spatial limits of the borrow areas <br /> as detailed within the Contract Documents (plans and specifications) . There shall be no <br /> allowable deviation from these requirements . The designated borrow area volumetric <br /> capacities, as approved, far exceed the volumetric requirements of the permitted fill area . <br /> 7 <br />