My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-361
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-361
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2016 1:59:12 PM
Creation date
9/30/2015 11:23:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
10/23/2007
Control Number
2007-361
Agenda Item Number
7.N.
Entity Name
Great Lakes Dredge and Dock Co.
Subject
Beach Restoration Project for Sectors 1 & 2
Second Amendment to Agreement
Area
Ambersand Beach
Project Number
0502
Bid Number
2006047
Supplemental fields
SmeadsoftID
6656
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEP Permit No . : 0166929-010-EM <br /> The Contractor shall continuously monitor the horizontal and vertical position of the <br /> dredge and cutterhead through the use of electronic positioning equipment previously <br /> approved by the County. A Differential Global Positioning System (DGPS) or equivalent <br /> shall be used to determine the horizontal position of the cutterhead. The horizontal <br /> positioning equipment shall maintain an accuracy of ±3 feet. The maximum cutterhead <br /> depth shall be measured by an appropriate depth measuring device. The cutterhead depth <br /> positioning device shall maintain a vertical accuracy of ±0 . 5 feet and have the ability to <br /> perform hourly or real-time tide corrections. The tide shall be measured using a tide staff <br /> or electronic gauge in the vicinity of the active borrow site, and the Contractor shall have <br /> the ability to retrieve the tide data on a real-time or hourly basis. The Project Engineer <br /> shall enforce these requirements during project construction under the terms and <br /> provisions of the Technical and Environmental Specifications and through compliance <br /> and enforcement provisions as stipulated by the Contract Documents . <br /> The Contractor is required to continuously operate the electronic positioning equipment <br /> and plot the position of the dredge cutterhead. The positioning equipment shall be <br /> installed on the dredge so as to monitor, as accurately as possible, the actual location of <br /> the cutterhead. A printout of the horizontal location of the cutterhead in State Plane <br /> coordinates and the cutterhead depth (corrected for tide elevation and referenced to <br /> NGVD and time) shall be maintained using an interval of 30 seconds for each printed <br /> position. Printed and electronic files of the position data (in ASCII format), position <br /> plots, the location of the master antenna on the dredge, and the distance and direction <br /> from the master antenna to the cutterhead shall be provided to the County as part of the <br /> daily report. <br /> Monitoring and Reporting <br /> The daily review process shall include continuous monitoring of the position of the <br /> dredge and cutterhead through the use of global positioning equipment and a tide <br /> adjusted depth measuring device. This data shall be reviewed by the on-board Dredge <br /> Operator on a continuous basis and reviewed by the Contractor and Site Representative <br /> daily. The Contractor shall be available to the Dredge Operator at all times in the event <br /> that a problem or difficulty arises with the dredge or dredging operation. <br /> The daily report shall include the location of the cutterhead in State Plane coordinates and <br /> the cutterhead depth, corrected for tide elevation and referenced to NGVD and time, <br /> taken at 30 second intervals. Additionally, the daily report shall include an assessment of <br /> the quality and volume of material being dredged. <br /> Remediation <br /> The Contractor is charged with ensuring the correct volume of material is placed within <br /> the beach fill template along the Sectors 1 and 2 shoreline and to guarantee that <br /> excavation shall not extend below the allowable depth, within the dredge exclusion <br /> area, or outside of the spatial (horizontal) limits of the borrow areas as detailed <br /> within the construction documents and the issued Permits . The Contractor shall be <br /> responsible for establishing such control as may be necessary to ensure strict adherence <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.