My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-286
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-286
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2016 2:18:33 PM
Creation date
10/1/2015 3:57:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/03/2009
Control Number
2009-286
Agenda Item Number
12.J.1
Entity Name
Ecotech Consultants
Subject
Work Order No.2 Wetlands Maintenance Services Agreement
Area
Spoonbill Marsh North County Brine Disposal
Supplemental fields
SmeadsoftID
10858
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 2 . Seagrass Monitoring <br /> ETC will map the seagrass communities in the Indian River Lagoon (hereafter referred to as Lagoon) <br /> adjacent to the Spoonbill Marsh project . In addition, two background sites will be located and <br /> monitored in a section of the Lagoon away from the influence of the Spoonbill Marsh site . The <br /> seagrass communities will be mapped once per year during the month of July . <br /> The deliverables for this task will be a figure showing the general location of the seagrass transects <br /> and a table showing the data collected along each transect . <br /> Task 3 . Off- Site Biodiversity Monitoring <br /> ETC will assist the County with biodiversity monitoring in the Lagoon as defined by the Industrial <br /> Waste Facility Permit (Permit Number 31 -FL0166511 ) . This assistance will be limited to selection <br /> of the three sample stations in the section of the Lagoon adjacent to the Spoonbill Marsh, and two <br /> additional stations in the Lagoon away from the influence of the Spoonbill Marsh project . Others <br /> will be responsible for the collection and analysis of the biodiversity samples . <br /> The deliverables for this task will be a letter report summarizing the Lagoon bottom conditions at <br /> the points where the biodiversity samples are to be collected. <br /> Task 4 . Vegetation Mapping <br /> ETC will prepare a vegetation map for the Spoonbill Marsh project site . This map will be prepared <br /> once per year during the months of May to June . <br /> The deliverables for this task will include a figure showing the general location of the point intercept <br /> transects, a map showing the general location of the on- site plant communities, a table showing the <br /> plants species encountered along each transect, and a plant species list . <br /> Task 5 . Fisheries Monitoring <br /> ETC will monitor the fish populations on the Spoonbill Marsh site . The monitoring will be <br /> conducted using Breder traps and seine hauls once per year. Fish captured will be identified, <br /> enumerated and released . Where field identification of an individual is not possible, at least one <br /> voucher specimen will be preserved in 10 percent formalin for future identification . <br /> The deliverables for this task will include a figure showing the general location of the monitoring <br /> sites , a general description of the vegetation present at each site , water depths , and a list of fish <br /> species captured at each monitoring station . <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.