My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-106
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2016 3:48:51 PM
Creation date
9/30/2015 6:29:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
05/06/2003
Control Number
2003-106
Agenda Item Number
11.C.1.
Entity Name
Department of Utility Services
Subject
16" Brine Pipeline-Addendum No.1
Area
58th Ave from77th St to 57th St and East on 57th St to Bent Pine R.I.B. Site
Project Number
UCP 2208
Bid Number
5050
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3231
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 2 <br /> SUPPLEMENTARY SPECIFICATIONS <br /> SECTION 2 <br /> PIPE INSTALLATION <br /> 2 .2 . 1 . Excavation for Test Pits - Unclassified <br /> Description <br /> Excavation for test pits shall include test excavations to determine precise locations of utilities, <br /> ' including culverts, sewers, water pipe, gas pipe, conduits, cable, manholes, inlets and similar <br /> structures . <br /> tMaterials <br /> No materials are required. <br /> Method of Construction <br /> Before laying pipe line, the Contractor shall ascertain the location and grade of utility pipes and <br /> other subsurface structures which may interfere with such construction. Test pits shall be <br /> ' excavated wherever necessary to obtain the required information, subject to the approval of the <br /> Engineer. The Contractor shall determine the precise locations of utilities being crossed by the <br /> construction. The Engineer shall then determine the alignment of the construction which will <br /> avoid conflict with existing utilities. <br /> ' 2.2 .2 Saw Cut Pavement <br /> Description <br /> ' This item of work shall consist of saw cutting of the bituminous and concrete roadway, <br /> driveways and sidewalks, in accordance with these Specifications and within reasonable <br /> conformity to the lines shown on the drawing and/or as directed by the Engineer. <br /> Materials <br /> ' No materials are required for this item of work. <br /> ' 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.