14 . THE NOTES ON U = l CONCERNING A WELL AND IRRIGATION ARE NOT OF SUFFICIENT <br /> DETAIL FOR THE CONTRACTOR TO DETERMINE WORK REQUIRED . <br /> The existing well and irrigation system near the proposed lift station, as with other existing <br /> improvements, must be modified as necessary to accommodate the lift station and provide <br /> irrigation coverage equivalent to the existing system. <br /> 15 . THE ELECTRICAL SERVICE AND UTILITY INFORMATION IS NOT OF SUFFICIENT DETAIL <br /> TO DETERMINE WORK REQUIRED , FOR NUMBER OF PHASES , SERVICE TO THE LIFT <br /> STATION , UTILITY RELOCATIONS , TELEPHONE LINES , AND COORDINATION WITH FPL . <br /> FP&L service extensions are shown on sheet. U- 1 . Underground utilities are indicated to the extent <br /> known. Be advised "Sunshine State One Call" no longer responds to requests for locates from <br /> surveyors or engineers. CONTRACTOR will have to locate and adjust the existing utilities in <br /> accordance with the notes on sheet U-2. FP&L was forwarded with service request information <br /> indicating revised design components. <br /> 16 . Mr. Davis, Director of Public Works, advised revisions to the lift station will be submitted to the <br /> bidders. The revisions essentially include a station with addition capacity. WILL THERE BE AN <br /> ADDITIONAL 10 DAYS FOR BIDDER REVIEW OF THE REVISED LIFT STATION BEFORE THE BID <br /> OPENING DATE? If necessary the bid date will be extended. As above the bid date has been <br /> extended. <br /> 17 , through 21 . ADDITIONAL QUESTIONS CONCERNING INSUFFICIENT INFORMATTION <br /> RELATIVE TO THE METER SOUTH OF THE WET WELL, NOTES ON U 1 FOR CLARITY, <br /> WELL PERMIT, NO DETAIL DRAWINGS FOR THAT WORK, NO POINT OF POWER <br /> CONNECTION FOR LIFT STATION , HOW WILL POWER TO LIFT STATION BE <br /> PROVICED , AND NO RISER DETAIL . <br /> Regarding the power connection to the lift station and how power will be provided, the Contractor <br /> shall hire a licensed electrical contractor to design and connect the power service for the lift station. <br /> See attached Sheets U- 1 REVISED, and additional DRAWING Sheet U-8A REVISED for details. These <br /> DRAWINGS SHALL BECOME A PART OF THE CONTRACT DOCUMENTS TOGETHER WITH <br /> DRAWINGS U-7 REVISED, U-8 REVISED, AND OTHER DRAWINGS HEREIN. <br /> 22 . NOTE : Mr. Davis advised the Wabasso Beach Park site is very busy with private businesses at the entrance <br /> along the north, and Disney activity to the south. It will be necessary to close the Park from time to time and <br /> divert patrons to the Golden Sands Park. Consequently safety and protection of the public is very important <br /> and will require the CONTRACTOR 'S attention. <br /> Item 3 - Response to questions received after the February 28 , 2008 Prebid Conference : <br /> 1 . SECTION 2 . 02 OF THE SPECIFICATIONS CALL FOR ALUMINUM WIRE , WILL ALUMINUM <br /> WIRE BE ALLOWED ON A BEACH FRONT PROJECT? <br /> Delete the reference to the use of aluminum wire and use copper wire only. <br /> 2 . SECTION 2 . 09 METERING SPECIFICATIONS , SPECIFICATION SHOULD BE ALUMINUM <br /> METER SOCKET . NEC REQUIRES "ALL MATERIALS TO BE SUITABLE FOR THE <br /> LOCATION " ? <br /> There is not a copper meter can. Project will require a standard aluminum meter can that can be <br /> used in a location near the beach. <br /> 3 . PLEASE PROVIDE SPECIFICATIONS FOR TIMECLOCKS . <br /> The time clock will be equal to an Intermafic T101P. <br /> 4 , THERE IS NO CIRCUIT SHOWN FOR EXHAUST FANS . <br /> The exhaust fans shall be tied into the lighting circuit in the appropriate bathroom . <br /> 5 . SHEET El . 01 IS SCALE 1 " = 20' ? <br /> F :\Public Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 2-6-2008\Adde dum Page 41011 #3 , #4 , & <br /> #5WDDENDUM #2 AND ATTACHMENTS\Addendum Rev 3-12-08 <br />