My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Length of proposed fence - 70 feet including an 18 ' gate <br /> 15 . C-3 , PLEASE PROVIDE QUANTITY AND SPECIE FOR THE DUNE VEGETATION . <br /> Sea Oaks @ 75! coverage - ^-3, 200 Plants <br /> Railroad Vine @ 15% coverage - 650 Plants <br /> Sea Oxidaisy @ 10% coverage - 450 Plants <br /> 16 , C -4 , THE QUANTITIES GIVEN FOR NEW ASPHALT ARE INCONSISTENT WITH THE BID <br /> FORM , PLEASE VERIFY CORRECT QUANTITIES AND REVISE THE BID FORM <br /> ACCORDINGLY . <br /> Bid sheet has not been revised since bid quantity is equivalent to the total surface area of the <br /> proposed parking lot. The CONTRACTOR will install 2. 5 inch layer of asphalt over -5, 660 sgft (628 <br /> syd) of new pavement and a 1 inch layer of asphalt over ~ 15, 850 sqft (1, 761 syd) of old pavement <br /> which is not proposed to be removed. Therefore, a total of 2390 syd of asphalt will be installed. <br /> Within bid item 2. 02 the CONTRACTOR will be responsible for all materials, equipment, and labor for <br /> the proper installation of the sub-grade stabilization, base, asphalt, and required testing. <br /> Approximate cut and rill quantities are shown on page C4 . <br /> 17 , C-7 , PLEASE VERIFY THAT THE BOARDWALK COVERED ROOFS ARE TO RECEIVE <br /> SHINGLES IN LIEU OF METAL ROOFING TO MATCH THE RESTROOM AND PAVILIONS . <br /> CONTRACTOR shall provide metal roofing identical in type and installed as identiried on the <br /> architectural and structural drawings in lieu of the shingle roofing shown on C- 7. <br /> 18 , U - 1 , THERE ARE TWO WATER METERS THAT ARE NOTED TO BE RELOCATED . IS THIS <br /> CORRECT , THAT THE METER OWNER ( UTILITY) WILL DO THE RELOCATION ? <br /> The relocation of the two water meters is included in the scope of work for this CONTRACT, see <br /> sheets U- 1 REVISED and U-8AREVISED. <br /> 19 . U - 1 , IF THE EXISTING WELLS AND IRRIGATION SYSTEM ARE TO BE ABANDONED BY THE <br /> CONTRACTOR PLEASE PROVIDE A DETAIL OF THE WORK INVOLVED . <br /> See notes provided on U4A REVISED for details. <br /> 20 . U - 1 , WILL THE CONTRACTOR BE REQUIRED TO INSTALL THE NEW WELL AND IRRIGATION <br /> WORK? IF SO PROVIDE A DETAIL . <br /> See notes provided on !/- 8A REVISED for details. , <br /> 21 . U- 1 , WILL THE CONTRACTOR BE REQUIRED TO RELOCATE THE EXISTING TELEPHONE <br /> SERVICE? IF SO PROVIDE A DETAIL <br /> Contractor will be responsible to relocate all indicated utilities . See plan details, sheet U- 1 REVISED <br /> and U4A REVISED, See Existing Utility notes on sheet U-2. <br /> 22 , U- 1 , REGUARDING THE FP & L 3 PHASE POWER EXTENSION , HAS FPL COMPLETED THIS <br /> WORK? <br /> Na <br /> 23 . U - 1 , REGUARDING THE FPL 230 VOLT 3 PHASE BURIED SERVICE TO POLE , HAS FPL <br /> COMPLETED THIS WORK? <br /> The buried electric service is by CONTRACTOR. See site plan details sheet U- 1REViSED and notes <br /> on U-7 REVISED. . <br /> 24 . U -7 , PLEASE PROVIDE ELECTRICAL SERVICE REQUIREMENTS FOR THE LIFT STATION <br /> THAT IS COMPATIBLE WITH SERVICE FOR ALL OTHER BUILDINGS AND SITE LIGHTING . <br /> N/A, . lift station requires separate electric service and meter can. <br /> F :\Public Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bld Documents as of 2-6-2008\Addendum #1 #2, #3 , #41 & <br /> #5\ADDENDUM #2 AND ATTACHMENTS\Addendum #2.doc Page 6 of 11 <br /> Rev. 3-12-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.