Laserfiche WebLink
• Length of proposed fence - 70 feet including an 18 ' gate <br /> 15 . C-3 , PLEASE PROVIDE QUANTITY AND SPECIE FOR THE DUNE VEGETATION . <br /> Sea Oaks @ 75! coverage - ^-3, 200 Plants <br /> Railroad Vine @ 15% coverage - 650 Plants <br /> Sea Oxidaisy @ 10% coverage - 450 Plants <br /> 16 , C -4 , THE QUANTITIES GIVEN FOR NEW ASPHALT ARE INCONSISTENT WITH THE BID <br /> FORM , PLEASE VERIFY CORRECT QUANTITIES AND REVISE THE BID FORM <br /> ACCORDINGLY . <br /> Bid sheet has not been revised since bid quantity is equivalent to the total surface area of the <br /> proposed parking lot. The CONTRACTOR will install 2. 5 inch layer of asphalt over -5, 660 sgft (628 <br /> syd) of new pavement and a 1 inch layer of asphalt over ~ 15, 850 sqft (1, 761 syd) of old pavement <br /> which is not proposed to be removed. Therefore, a total of 2390 syd of asphalt will be installed. <br /> Within bid item 2. 02 the CONTRACTOR will be responsible for all materials, equipment, and labor for <br /> the proper installation of the sub-grade stabilization, base, asphalt, and required testing. <br /> Approximate cut and rill quantities are shown on page C4 . <br /> 17 , C-7 , PLEASE VERIFY THAT THE BOARDWALK COVERED ROOFS ARE TO RECEIVE <br /> SHINGLES IN LIEU OF METAL ROOFING TO MATCH THE RESTROOM AND PAVILIONS . <br /> CONTRACTOR shall provide metal roofing identical in type and installed as identiried on the <br /> architectural and structural drawings in lieu of the shingle roofing shown on C- 7. <br /> 18 , U - 1 , THERE ARE TWO WATER METERS THAT ARE NOTED TO BE RELOCATED . IS THIS <br /> CORRECT , THAT THE METER OWNER ( UTILITY) WILL DO THE RELOCATION ? <br /> The relocation of the two water meters is included in the scope of work for this CONTRACT, see <br /> sheets U- 1 REVISED and U-8AREVISED. <br /> 19 . U - 1 , IF THE EXISTING WELLS AND IRRIGATION SYSTEM ARE TO BE ABANDONED BY THE <br /> CONTRACTOR PLEASE PROVIDE A DETAIL OF THE WORK INVOLVED . <br /> See notes provided on U4A REVISED for details. <br /> 20 . U - 1 , WILL THE CONTRACTOR BE REQUIRED TO INSTALL THE NEW WELL AND IRRIGATION <br /> WORK? IF SO PROVIDE A DETAIL . <br /> See notes provided on !/- 8A REVISED for details. , <br /> 21 . U- 1 , WILL THE CONTRACTOR BE REQUIRED TO RELOCATE THE EXISTING TELEPHONE <br /> SERVICE? IF SO PROVIDE A DETAIL <br /> Contractor will be responsible to relocate all indicated utilities . See plan details, sheet U- 1 REVISED <br /> and U4A REVISED, See Existing Utility notes on sheet U-2. <br /> 22 , U- 1 , REGUARDING THE FP & L 3 PHASE POWER EXTENSION , HAS FPL COMPLETED THIS <br /> WORK? <br /> Na <br /> 23 . U - 1 , REGUARDING THE FPL 230 VOLT 3 PHASE BURIED SERVICE TO POLE , HAS FPL <br /> COMPLETED THIS WORK? <br /> The buried electric service is by CONTRACTOR. See site plan details sheet U- 1REViSED and notes <br /> on U-7 REVISED. . <br /> 24 . U -7 , PLEASE PROVIDE ELECTRICAL SERVICE REQUIREMENTS FOR THE LIFT STATION <br /> THAT IS COMPATIBLE WITH SERVICE FOR ALL OTHER BUILDINGS AND SITE LIGHTING . <br /> N/A, . lift station requires separate electric service and meter can. <br /> F :\Public Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bld Documents as of 2-6-2008\Addendum #1 #2, #3 , #41 & <br /> #5\ADDENDUM #2 AND ATTACHMENTS\Addendum #2.doc Page 6 of 11 <br /> Rev. 3-12-08 <br />