My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (3)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:38:00 AM
Creation date
10/1/2015 12:21:15 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7472
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
25 . U -7 , LIFT STATION NOTE STATES , "SEE ELECTRICAL DRAWINGS FOR SERVICE <br /> REQUIREMENTS , " PLEASE PROVIDE THIS INFORMATION . <br /> See notes on sheet U4 REVISED and U-8 REVISED. <br /> 26 , LA- 1 , IN THE TOP RIGHT CORNER , THE NOTE READS , " PROPOSED DUNE VEGETATION " , <br /> HAS THIS WORK BEEN COMPLED OR IS THE CONTRACTOR REQUIRED TO DO THIS <br /> WORK? IF INCLUDED IN THE CONTRACT PLEASE PROVIDE SPECIE AND QUANTITY , <br /> See Item 3 # 15 above. <br /> 27 . LA- 1 , PLEASE PROVIDE QUANTITY AND SPECIE OF SOD . <br /> Muhly Grass will be used in lieu of sod. The new quantity of Muhly Grass will be 278, as noted on <br /> the plant list, plus an additional 970 for coverage of the previously called out sod areas. <br /> 28 . LA- 1 , THE ENTRANCE GATE IS NOTED AS NEW , SHEET C-2 NOTES THE GATE AS EXITING , <br /> PLEASE CLARIFY AND PROVIDE DETAIL IF A NEW GATE IS REQUIRED . <br /> The existing entrance gate shall be removed and replaced as necessary for construction. <br /> 29 . LA- 1 , THE PROPOSED FENCE SHOWN AT THE NORTH PROPERTY LINE INDICATES A <br /> GATE , IS THIS GATE A C . L . FENCE GATE OR STEEL? PLEASE CLARIFY AND PROVIDE A <br /> DETAIL . <br /> Please see Technical Specification SECTION 020821 for gate and fence detail. <br /> 30 . LA- 1 , PLEASE REVIEW THE LANSCAPE WARRANTY PERIOD AS IT WILL BE VERY COSTLY <br /> TO HAND WATER THE LANDSCAPING FOR ONE ( 1 ) YEAR . <br /> There is no irrigation system for this project. A (5) month watering schedule by landscape contractor <br /> would provide for a (5) month warranty period. The County will pick upon additional maintenance <br /> after this initial (5) month period. The warranty period will need to be negotiated with the chosen <br /> landscape contractor, since there will be no irrigation system installed. See attached watering <br /> schedule. <br /> 31 . AS0 . 10 , AT THE ENTRANCE GATE , THE DRAWINGS SHOW PAVEMENT MARKINGS FOR A <br /> CROSSWALK , INCLUDING A SIDEWALK TIE IN TO THE EXISTING SIDEWALK , SHEET C2 IS <br /> ABSENT THIS WORK , PLEASE CLARIFY . <br /> Construction for these items shall be completed per sheet C2, which includes the sidewalk tie in to <br /> the existing sidewalk on the north side of Wabasso Beach Road, a sidewalk tie into the proposed <br /> sidewalk south of Wabasso Beach Road, however no pavement markings are to be constructed. <br /> 32 . A3 . 10 , THE ELEVATION OF THE RESTROOM SHOWS A DECORATIVE LIGHTINING ROD , <br /> THERE IS NO SPECIFIC INFORMATION FOR LIGHTNING PROTECTION OR SHOOWN ON <br /> THE ELECTRICAL DRAWINGS , PLEASE CLARIFY . <br /> Lightning rod is non-functional, decorative only. No need to be shown on the Electrical drawings . <br /> I J <br /> 33 . A6 . 101 DOOR SCHEDULE , WILL THE OWNER ACCEPT REINFORCED FIBERGLASS DOORS <br /> & FRAMES AS A SUBSTITUTION/EQUAL? THIS PRODUCT CARRIES A FIVE YEAR <br /> WARRANTY AND IS BETTER SUITABLE FOR THIS APPLICATION THAN STAINLESS STEEL . <br /> Fiberglass door and frames are acceptable as a substitution . Contractor must bid the Stainless Steel <br /> door and frames per the specifications and qualify the cost of the fiberglass doors as an alternate. <br /> 34 . E1 . 00 , FIXTURE SCHEDULE , PLEASE VERIFY THAT THE FIXTURES SPECIFIED ARE IN <br /> COMPLIANCE WITH THE DEP SPECIAL CONDITIONS FOR THESE FIXTURES . <br /> Fixtures specified have been designed to be in according with FDEP. Prior to construction, all <br /> exterior light fixtures will be approved by FDEP. <br /> 35 , E2 . 00 , PANEL SCHEDULE , PLEASE CONFIRM THAT CIRCUITRY IS PROVIDED FOR THE <br /> RESTROOM EXHAUST FANS . I J <br /> F :\Public Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 2-6-2008\Addendum #1 #2 , #3 , #4 , & <br /> #5\ADDENDUM #2 AND ATTACHMENTS\Addendum #2 . doc Page 7 of 11 <br /> Rev . 3-12-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.