Laserfiche WebLink
L <br /> C . All construction survey work and work for Record Drawings shall be performed <br /> under the guidance and direction of a Florida Registered Surveyor and Mapper. <br /> D . Maintain a complete , accurate log of all control and survey work as it progresses . <br /> 1 . 4 SUBMITTALS <br /> A . Before beginning work, submit name and qualifications of Field <br /> Engineer/Superintendent to ENGINEER . <br /> B . Before beginning work , submit name and address of Professional Surveyor and <br /> Mapper to ENGINEER . <br /> C . On request of ENGINEER or ENGINEER' s CONSULTANT , submit <br /> documentation to verify accuracy of field engineering and survey work . <br /> D . Complete and submit Section 00634 — " Professional Surveyor and Mapper' s <br /> Certification as to Elevations and Locations of the Work , " with the Final <br /> Application for Payment . <br /> + + END OF SECTION + + <br /> b <br /> Last Revised 12/2007 01050-3 Wabasso Beach Pk Restoration <br /> F:\Public Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01050 - Field Engineering .doc <br /> r <br />