My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L . If a submittal is unacceptable , three (3 ) copies will be returned to <br /> CONTRACTOR with one of the following notations : <br /> 1 . " Revise and Resubmit" <br /> 2 . " Not Approved " <br /> M . Upon return of a submittal marked " Revise and Resubmit" , make the corrections <br /> indicated and repeat the initial approval procedure . The " Not Approved " notation <br /> is used to indicate material or equipment that is not acceptable . Upon return of a <br /> submittal so marked , repeat the initial approval procedure utilizing acceptable <br /> material or equipment . <br /> N . Any related Work performed or equipment installed without an "Approved " or <br /> "Approved as Corrected " Shop Drawing or Design Drawing will be the sole <br /> responsibility of the CONTRACTOR . <br /> O . Submit Shop Drawings or Design Drawings well in advance of the need for the <br /> material or equipment for construction and with ample allowance for the time <br /> required to make delivery of material or equipment after data covering such is <br /> „ approved . CONTRACTOR shall assume the risk for all materials or equipment , <br /> which are fabricated or delivered prior to the approval of Shop Drawings . <br /> Materials or equipment will not be included in periodic progress payments until <br /> approval thereof has been obtained in the specified manner. <br /> P . ENGINEER will review and process all submittals promptly , but a reasonable <br /> time should be allowed for this , for the Shop Drawings or Design Drawings being <br /> revised and resubmitted , and for time required to return the approved Shop <br /> Drawings or Design Drawings to the CONTRACTOR . <br /> Q . Furnish required submittals with complete information and accuracy in order to <br /> achieve required approval of an item within three submittals . All costs to <br /> ENGINEER or ENGINEER' s CONSULTANT involved with subsequent submittals <br /> of Shop Drawings , Samples or other items requiring approval , will be <br /> backcharged to CONTRACTOR in accordance with the General Conditions and <br /> the Supplementary Conditions . If the CONTRACTOR requests a substitution for <br /> a previously approved item , all of ENGINEER'S and ENGINEER' s <br /> CONSULTANT ' s costs in the reviewing of the substitution will be backcharged to <br /> CONTRACTOR unless the need for such substitution is beyond the control of <br /> CONTRACTOR . <br /> + + END OF SECTION + + <br /> Last Revised 12/2007 01340-6 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01340 - Submittal of Shop Drawings , Product Data, and Samples .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.