Laserfiche WebLink
SECTION 01380 <br />CONSTRUCTION PHOTOGRAPHS <br />1.1 SUMMARY <br />A. This Section specifies requirements of photographic documentation of project <br />conditions before, during, and after construction. <br />Be The ENGINEER or ENGINEER's CONSULTANT has the authority to reject any or <br />all photographs and order that they be redone at, no additional charge. Rem <br />photograph areas of unacceptable coverage within five (5) days after being notified <br />by the ENGINEER or ENGINEER's CONSULTANT. All photographs shall become <br />the property of the OWNER. <br />1.2 SUBMITTALS <br />A. Required submittals: <br />1. Pre -construction photographs: Submit before construction activities <br />commence. <br />2. Construction progress photographs and other construction photographs: <br />Submit with each pay request. <br />3. Post -construction photographs: Submit with the final application for payment. <br />Be Make color photographs with a digital camera (minimum 4.0 mega pixel quality). <br />Provide the ENGINEER with photographs in two formats: <br />1. hard copy (3 -inch by 5 -inch); <br />2e digital photographs on CD's. <br />1.3 QUALITY ASSURANCE <br />A. Take post -construction photographs at the same time of day and same direction as <br />those taken for pre -construction records. <br />Be Index and catalog photographs in such a manner that each scene is readily <br />identifiable. (e.g. For each photograph, provide appropriate written documentation <br />describing the location, orientation of view, date, time of day, and other pertinent <br />comments.) <br />2.1 CONSTRUCTION DOCUMENTATION <br />A. Pre -Construction Photographs: <br />Last Revised 12/2007 01380-1 Wabasso Beach Pk Restoration <br />F:\Public Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1-9-2008\Technical <br />Specifications\Div 1\01380 - Construction Photographs.doc <br />1 <br />