My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01520 <br /> CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br /> 1 . 1 SCOPE <br /> A. Provide all construction equipment and facilities and temporary controls required to <br /> satisfactorily complete the Work represented on the Drawings and described in the <br /> Specifications . <br /> 1 . 2 RESPONSIBILITY <br /> A. All construction facilities and temporary controls remain the property of the <br /> Contractor establishing them and shall be maintained in a safe and useful condition <br /> until removed from the construction site . <br /> Be All false work , scaffolding , ladders , hoistways , braces , pumping plants , shields , <br /> trestles , roadways , sheeting , centering forms , barricades , drains , flumes , and the <br /> like , any of which may be needed in construction of any part of the Work and which <br /> are not herein described or specified in detail , must be furnished , maintained and <br /> removed by the CONTRACTOR , who is responsible for the safety and efficiency of <br /> such work and for any damage that may result from their failure or from their <br /> improper construction , maintenance or operation . <br /> C . In accepting the Contract , the CONTRACTOR assumes full responsibility for the <br /> sufficiency and safety of all hoists , cranes , temporary structures orwork and for any <br /> damage which may result from their failure or their improper construction , <br /> maintenance , or operation and will indemnify and save harmless the OWNER , <br /> ENGINEER' s CONSULTANT , and ENGINEER from all claims , suits oractions , and <br /> damages or costs of every description arising by reason of failure to comply with the <br /> above provision . <br /> 1 . 3 TEMPORARY UTILITIES AND SERVICES <br /> A . TEMPORARY WATER <br /> 1 . Provide a temporary water service as required for all construction purposes <br /> and pay for all water used . <br /> 2 . Furnish potable drinking water in suitable dispensers and with cups for use of <br /> all employees at the job . <br /> 3 . Provide all temporary piping , hoses , etc . , required to transport water to the <br /> point of usage by all trades . <br /> 4 . When temporary water service is no longer required , remove all temporary <br /> water lines . <br /> Last Revised 12/2007 01520- 1 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01520 - Construction Facilities .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.