Laserfiche WebLink
covers, railings, ladders, stairs, etc., and compliance with law shall be the <br />CONTRACTOR's sole responsibility. <br />C. TEMPORARY CHUTES — Do not drop materials from structures except through <br />enclosed wooden or metal chutes, which shall be provided and maintained as <br />required for the performance of the work by the various trades. <br />1.5 SECURITY <br />A. Provide inspection of work area daily and take whatever measures are necessary to <br />protect the safety of the public, workmen, and materials, and provide for the security <br />of the site, both day and night. <br />1.6 TEMPORARY CONTROLS <br />A. Take all necessary precautions to control dust and mud associated with the Work. <br />In dry weather, spray dusty areas daily with water in order to control dust. Take <br />necessary steps to prevent the tracking of mud and other waste onto adjacent <br />streets and highways. <br />1.7 FIELD OFFICES AND STORAGE SHEDS <br />A. Provide field office and storage sheds as required for the performance of the work <br />and protection and securing of materials and equipment. <br />1.8 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br />A. Remove the various temporary facilities, services, and controls, and legally dispose <br />of them as soon as the work is complete. The areas of the site used for temporary <br />facilities shall be properly reconditioned and restored to a condition acceptable to <br />the ENGINEER and OWNER. <br />Last Revised 12/2007 <br />+ + END OF SECTION + + <br />01520-3 Wabasso Beach Pk Restoration <br />FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1-9-2008\Technical <br />Specifications\Div 1\01520 -Construction Facilities.doc <br />