My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
covers , railings , ladders , stairs , etc . , and compliance with law shall be the <br /> CONTRACTOR' s sole responsibility . <br /> C . TEMPORARY CHUTES — Do not drop materials from structures except through <br /> enclosed wooden or metal chutes , which shall be provided and maintained as <br /> required for the performance of the work by the various trades . <br /> 1 . 5 SECURITY <br /> A . Provide inspection of work area daily and take whatever measures are necessary to <br /> protect the safety of the public , workmen , and materials , and provide for the security <br /> of the site , both day and night . <br /> 1 . 6 TEMPORARY CONTROLS <br /> A . Take all necessary precautions to control dust and mud associated with the Work . <br /> In dry weather, spray dusty areas daily with water in order to control dust . Take <br /> necessary steps to prevent the tracking of mud and other waste onto adjacent <br /> streets and highways . <br /> 1 . 7 FIELD OFFICES AND STORAGE SHEDS <br /> A . Provide field office and storage sheds as required for the performance of the work <br /> and protection and securing of materials and equipment . <br /> 1 . 8 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br /> A . Remove the various temporary facilities , services , and controls , and legally dispose <br /> of them as soon as the work is complete . The areas of the site used for temporary <br /> facilities shall be properly reconditioned and restored to a condition acceptable to <br /> the ENGINEER and OWNER . <br /> + + END OF SECTION + + <br /> Last Revised 12/2007 01520-3 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01520 - Construction Facilities .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.