My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (4)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:41:08 AM
Creation date
10/1/2015 12:21:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA.
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7473
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
commencing work is provided below . This list serves as a guide only and is <br /> not intended to limit the utility companies , which the CONTRACTOR may wish <br /> to notify. <br /> a . Indian River County Division of Utility Services <br /> 1801 27th Street ( Building A) <br /> Vero Beach , Florida 32960 <br /> (772 ) 567-8000 <br /> b . Southern Bell <br /> 3300 Okeechobee Road , Room 246 <br /> Ft , Pierce , Florida 33450 <br /> Engineering Office : (772 ) 465-9736 <br /> Cable Locator Number: 1 -800=432-4770 <br /> c . Florida Power and Light Co . <br /> 1050 SE Brandon Circle <br /> Port St . Lucie , Florida 34952 <br /> 1 -800=995-5762 <br /> FAX (772 ) 337-7099 <br /> f. Buried Telephone Cable Locator Number — Sunshine One Call <br /> 811 ; http ://www . calisunshine . com/ssocof/index . htm <br /> 4 . Schedule and execute all work involving existing utilities in order to minimize <br /> necessary interruption of services . Whenever such interruption is necessary <br /> for completion of the work , notify the ENGINEER and the appropriate utility at <br /> least 48 hours in advance . Perform all work to repair/restore utility service to <br /> the satisfaction of the appropriate utility. Include all costs related to service <br /> maintenance , interruption , and restoration in the appropriate line item in the <br /> Contract. <br /> 5 . Explore ahead of trenching and excavation work and uncover all obstructing <br /> underground structures sufficiently to determine their location , to prevent <br /> damage to them and to prevent interruption of the services that such structures <br /> provide . If CONTRACTOR damages an underground structure , restore it to <br /> original condition at CONTRACTOR' s expense . <br /> 6 . Necessary changes in the location of the Work may be made by ENGINEER or <br /> ENGINEER' s CONSULTANT , to avoid unanticipated underground structures . <br /> 7 . If permanent relocation of an underground structure or other subsurface facility <br /> is required and is not otherwise provided for in the Contract Documents , <br /> ENGINEER or ENGINEER' s CONSULTANT will direct CONTRACTOR in <br /> writing to perform the Work , which shall be paid for under the provisions of <br /> Article 11 of the General Conditions . <br /> Be Surface Structures : <br /> 1 . Surface structures are defined as structures or facilities above the ground <br /> surface . Included with such structures are their foundations and any extension <br /> Last Revised 12/2007 01541 -4 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01541 - Protection of the Work and Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.