Laserfiche WebLink
below the surface . Surface structures include but are not limited to , buildings , <br /> tanks , walls , bridges , roads ( paved or unpaved ) , dams , channels , open <br /> F drainage , piping , poles , wires , posts , signs , markers , curbs , walks and all other <br /> facilities that are visible above the ground surface . <br /> C . Protection of Underground and Surface Structures : <br /> 1 . Sustain in -place and protect from direct or indirect injury , all underground and <br /> surface structures located within or adjacent to the limits of the Work . Such <br /> sustaining and supporting shall be done carefully, and as required by the party <br /> owning or controlling such structure . <br /> 2 . Assume all risks attending the presence or proximity of all underground and <br /> surface structures within or adjacent to the limits of the Work. CONTRACTOR <br /> shall be responsible for all damage and expense for direct or indirect injury <br /> caused by its work to any structure . CONTRACTOR shall repair immediately <br /> all damage caused by its work , to the satisfaction of the owner of the damaged <br /> structure . <br /> D . All other existing surface facilities , including but not limited to , guardrails , posts , <br /> guard cables , signs , poles , markers , and curbs which are temporarily removed to <br /> facilitate installation of the Work shall be replaced and restored to their original <br /> condition at CONTRACTOR' S expense . <br /> 1 . 5 PROTECTION OF INSTALLED PRODUCTS AND LANDSCAPING <br /> • A . Provide protection of installed products to prevent damage from subsequent <br /> operations . Remove protection facilities when no longer needed . <br /> Be Control traffic to prevent damage to equipment , materials , and surfaces . <br /> C . Provide coverings to protect equipment and materials from damage . <br /> D . Cover projections , wall corners , jambs , sills , and soffits of openings , etc . in areas <br /> I L used for traffic and for passage of products in subsequent work . <br /> 1 . 6 PROTECTION OF THE WORK FROM STORMWATER RUNOFF <br /> A . Protect the Work from damage caused by stormwater runoff from rainfall . Comply <br /> with the requirements of Section 02225 . During the course of construction , it is <br /> possible that heavy rains may occur. Clean all dirt and debris from pipes , drainage <br /> structures , and other structures and repair all flooding , washouts , and other erosion <br /> damage to the Work caused by stormwater runoff, regardless of the state of <br /> completion of the Work , and until the Work is accepted by the OWNER , at no cost <br /> to the OWNER . <br /> Last Revised 12/2007 01541 -5 Wabasso Beach Pk Restoration <br /> FAPublic Works\Cliff Suthard\Wabasso Beach Park\A Construction Bid Documents\Bid Documents as of 1 -9-2008\Technical <br /> Specifications\Div 1 \01541 - Protection of the Work and Property.doc <br /> L <br /> rr <br />