Laserfiche WebLink
The CONTRACTOR shall promptly remove rejected articles or materials from the <br /> site of the Work after notification of rejection. All costs of removal and replacement <br /> of rejected articles or materials as specified herein shall be borne by the <br /> CONTRACTOR. <br /> D . Submittals <br /> 1 ) Along with the required bid and contract submittals, the CONTRACTOR shall <br /> submit to the ENGINEER, for review and approval, the items a and b as listed <br /> below: <br /> a) Five (5) sets of the manufacturer' s shop drawings, catalog cut sheets, <br /> technical data, installation requirements and recommended methods, and <br /> recommended repair methods. Upor approval by the ENGINEER, the <br /> manufacturer' s recommendations shall become the basis for acceptance or rejection <br /> of actual methods of installation used in the work. <br /> b) Certification of the manufacturer' s compliance with the specified standards <br /> and specifications for all materials. <br /> The CONTRACTOR shall not permit any materials to be brought onto the job site <br /> prior to obtaining approval from the ENGINEER. No pipe shall be delivered <br /> without prior notification to the ENGINEER. Each pipe section shall be subject to <br /> inspection by the ENGINEER immediately before it is installed. Any pipe section <br /> judged to be defective may be rejected. <br /> E. Safety <br /> The CONTRACTOR shall cant' out his operations in strict accordance with all OSHA and <br /> manufacturer' s safety requirements. Particular attention is drawn to those safety <br /> requirements involving working with hazardous/combustible material, (if needed), working <br /> in traffic areas , entering confined spaces, and operating heavy machinery. <br /> F. Warranty <br /> In addition to the CONTRACTOR' S one-year warranty, the pipe shall be certified by the <br /> manufacturer for specified material properties for this particular job. The manufacturer <br /> warrants the pipe to be free from defects in raw materials for one year from the date of <br /> acceptance. During the warranty period, any defects that affect the integrity or strength of <br /> the pipe shall be repaired at the CONTRACTOR' S expense in a manner mutually agreed by <br /> the OWNER and the CONTRACTOR. <br /> 2. MATERIALS <br /> A. High Density Polyethylene Pipe (H.D .P.E .) <br /> Pipe shall be new, unused, sections of polyethylene pipe having a nominal density of 0 .955 . <br /> The polyethylene resin used to manufacture the pipe shall have a "Plastic Pipe Institute" <br /> 02400 - Directional Bore Crossings <br /> 02400 = 3 <br />