My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-213 (5)
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-213 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2016 10:43:21 AM
Creation date
10/1/2015 12:22:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
07/01/2008
Control Number
2008-213
Agenda Item Number
8.AA
Entity Name
Ocean Gate General Contractors
Subject
Wabasso Beach Park Restoration
Area
Wabasso Beach
Bid Number
2008032
Supplemental fields
SmeadsoftID
7474
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The CONTRACTOR shall promptly remove rejected articles or materials from the <br /> site of the Work after notification of rejection. All costs of removal and replacement <br /> of rejected articles or materials as specified herein shall be borne by the <br /> CONTRACTOR. <br /> D . Submittals <br /> 1 ) Along with the required bid and contract submittals, the CONTRACTOR shall <br /> submit to the ENGINEER, for review and approval, the items a and b as listed <br /> below: <br /> a) Five (5) sets of the manufacturer' s shop drawings, catalog cut sheets, <br /> technical data, installation requirements and recommended methods, and <br /> recommended repair methods. Upor approval by the ENGINEER, the <br /> manufacturer' s recommendations shall become the basis for acceptance or rejection <br /> of actual methods of installation used in the work. <br /> b) Certification of the manufacturer' s compliance with the specified standards <br /> and specifications for all materials. <br /> The CONTRACTOR shall not permit any materials to be brought onto the job site <br /> prior to obtaining approval from the ENGINEER. No pipe shall be delivered <br /> without prior notification to the ENGINEER. Each pipe section shall be subject to <br /> inspection by the ENGINEER immediately before it is installed. Any pipe section <br /> judged to be defective may be rejected. <br /> E. Safety <br /> The CONTRACTOR shall cant' out his operations in strict accordance with all OSHA and <br /> manufacturer' s safety requirements. Particular attention is drawn to those safety <br /> requirements involving working with hazardous/combustible material, (if needed), working <br /> in traffic areas , entering confined spaces, and operating heavy machinery. <br /> F. Warranty <br /> In addition to the CONTRACTOR' S one-year warranty, the pipe shall be certified by the <br /> manufacturer for specified material properties for this particular job. The manufacturer <br /> warrants the pipe to be free from defects in raw materials for one year from the date of <br /> acceptance. During the warranty period, any defects that affect the integrity or strength of <br /> the pipe shall be repaired at the CONTRACTOR' S expense in a manner mutually agreed by <br /> the OWNER and the CONTRACTOR. <br /> 2. MATERIALS <br /> A. High Density Polyethylene Pipe (H.D .P.E .) <br /> Pipe shall be new, unused, sections of polyethylene pipe having a nominal density of 0 .955 . <br /> The polyethylene resin used to manufacture the pipe shall have a "Plastic Pipe Institute" <br /> 02400 - Directional Bore Crossings <br /> 02400 = 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.